Laserfiche WebLink
Page 1 of 2 <br /> <br />DATE: September 26, 2016 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Sue Iverson, Interim City Administrator <br /> <br />FROM: Andy Brotzler, Interim Public Works Director/City Engineer <br /> <br />SUBJECT: Shorewood Drive Bituminous Mill and Overlay <br /> <br /> <br />Requested Action <br /> <br />Accept proposal from Midwest Asphalt Corporation for the bituminous mill and overlay in the <br />amount of $79,694.30. <br /> <br />Background <br /> <br />This item was originally considered by the City Council on August 29, 2016. A proposal in the <br />amount of $44,394.30 was approved. After site review of the project with the Contractor and <br />staff, it was determined that additional work is necessary to complete the overlay project. <br /> <br />Discussion <br /> <br />While Shorewood Drive has existing bituminous curb along most of the roadway, there are <br />portions of curb that are missing or damaged. The initial proposal included a unit price to <br />remove and replace curb, the specific areas were not identified and the total cost of the <br />replacement was not included in the proposal. In addition, there was a concern that milling the <br />pavement in close proximity to the bituminous curb would create additional damage to the <br />already deteriorating curbing. <br /> <br />After visiting the site with the Contractor, staff requested a revised proposal to include curb <br />removal and replacement, including site restoration and driveway tie-ins that were not included <br />in the initial proposal. The revised proposal is in the amount of $79,694.30. <br /> <br />As presented at the August 29 Council meeting, the City has budgeted $150,000 for this type of <br />work in 2016. To date we have spent $68,471 of this budget. The work on Thom Drive totaled <br />$30,159 and $33,519 was spent on the Sandeen Road mill and overlay. The remaining budget for <br />Street Maintenance / sealcoat and resurfacing is $81,529. <br /> NEW BUSINESS – 9A <br /> <br /> <br /> MEMORANDUM <br />