My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-31-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
10-31-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2016 10:48:45 AM
Creation date
10/28/2016 10:42:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />Approved: <br /> <br />CITY OF ARDEN HILLS, MINNESOTA <br />PLANNING COMMISSION <br />WEDNESDAY, OCTOBER 5, 2016 <br />6:30 P.M. - ARDEN HILLS CITY HALL <br /> <br /> <br />PLANNING CASES <br /> <br />A. Planning Case 16-024 – Final PUD – 1150 County Road W East – No Public Hearing <br />Required <br /> <br />Senior Planner Bachler stated the City approved a Master PUD for the Arden Plaza retail center <br />in 2009 (Planning Case 09-011). This site is situated at the southwest corner of the County Road <br />E and Lexington Avenue intersection, and is approximately 11 acres in size. The approved plans <br />included the demolition of an existing office complex and the phased redevelopment of the site <br />to be completed in three stages. A total of 97,035 square feet of retail and commercial building <br />space was approved under the original PUD. For each successive phase of the redevelopment, a <br />Final PUD plan is required to be submitted to verify general conformance with the Master PUD <br />and to provide more detailed development plans for the phase to be implemented. <br /> <br />Senior Planner Bachler explained Phase I of the Master PUD was completed in 2012 and <br />included the construction of the Walgreens Pharmacy, modifications to parking and circulation <br />within the retail center, and stormwater management improvements. The Tavern Restaurant on <br />Lexington Avenue, which is currently under construction, is identified as Phase III of the Master <br />PUD. <br /> <br />Senior Planner Bachler reported MedExpress has requested a Final PUD for Phase II of the <br />Arden Plaza Master PUD to develop Lot 2, Arden Plaza for a 4,733 square foot neighborhood <br />medical clinic. The Master PUD Site Plan shows Phase II being developed as a 6,000 square foot <br />commercial building. The proposal by MedExpress would result in an overall lower density of <br />development on the site than what was originally approved for Phase II. The development plans <br />are in substantial conformance with the Master PUD plans. <br /> <br />Senior Planner Bachler indicated MedExpress operates numerous medical centers similar to the <br />one proposed for Arden Plaza across the country, and the company is expanding its operations in <br />Minnesota. Local medical centers have recently opened in the communities of Eden Prairie and <br />Plymouth. MedExpress offers a broad scope of services, including urgent care, employer health <br />services, and basic wellness and prevention services. The Arden Hills center would be open daily <br />from 8:00 a.m. to 8:00 p.m. <br /> <br />Senior Planner Bachler stated the proposed site design orients the clinic towards the other <br />buildings within the Arden Plaza retail center with the main entrance located at the southeast
The URL can be used to link to this page
Your browser does not support the video tag.