My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-31-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
10-31-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2016 10:48:45 AM
Creation date
10/28/2016 10:42:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – OCTOBER 10, 2016 2 <br /> <br />Councilmember Holden questioned how long this information should be placed on the City’s <br />website. <br /> <br />Mr. Jensen believed this information should only be placed on the City’s website for one year or <br />until the delinquency was paid. <br /> <br />3. STAFF COMMENTS <br /> <br />A. Rice Creek Commons (TCAAP) and Joint Development Authority (JDA) Update <br /> <br />Senior Planner Bachler stated there have been no Rice Creek Commons (TCAAP) meetings in <br />the last two weeks. It was noted Mayor Grant and Councilmember Holden met with the <br />developer, Alatus, on Thursday, October 6, 2016, to discuss the developer’s proposed Master <br />Plan. <br /> <br />B. Transportation Update <br /> <br />Interim Public Works Director/City Engineer Brotlzer reported construction on County Road <br />D had begun. He anticipated this work would be completed by Wednesday, November 2. <br /> <br />Interim Public Works Director/City Engineer Brotlzer stated Public Works staff was patching <br />potholes and had begun street sweeping. A map of this work would be provided to the City <br />Council at a future meeting. <br /> <br />Interim Public Works Director/City Engineer Brotlzer explained County Road H paving <br />would continue through this week and a permanent signal system would be completed over the <br />coming weeks. <br /> <br />Interim Public Works Director/City Engineer Brotlzer indicated the Lexington Avenue <br />medians were being paved at this time. The barrels would be moved from the outside to the <br />inside lanes later in the week. <br /> <br />Mayor Grant commented that County Road E2 was now open all the way into New Brighton. <br /> <br />Councilmember McClung asked what the estimated completion date was for the Lexington <br />Avenue project. <br /> <br />Interim Public Works Director/City Engineer Brotlzer would contact the County and report <br />back to the City Council. <br /> <br />Councilmember Holden understood this was not a MnDOT project, but rather was a County <br />project that should be completed by Tuesday, November 1, 2016, weather permitting. <br /> <br />4. APPROVAL OF MINUTES <br /> <br />A. September 13, 2016, Special City Council Work Session <br />B. September 19, 2016, City Council Work Session
The URL can be used to link to this page
Your browser does not support the video tag.