My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
06-27-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:52:59 AM
Creation date
11/3/2016 11:32:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM—9C <br /> Zoning Code Proposed Future Total <br /> Phase 1 Phase 2 <br /> Percent(%) of Plantings 10%Min. 2.98% 14.99% 18.19% <br /> Square feet of Plantings -- 39,632 185,763 225,395 sf. <br /> Total Landscaped Area -- 1,328,119 s£ 1,238,490 sf. 1,238,490 sf. <br /> C. Planting Islands—Meets Requirements <br /> At least ten (10)percent of a parking and driving area must be occupied by planting islands <br /> that are at least 150 square feet in size and have at least one tree. As proposed, Phase 1 of the <br /> project meets the minimum requirements with 14.89 percent of the parking lot occupied by <br /> planting islands. The Master PUD and future Phase 2 of the project suggest that after the <br /> expansion and reconfiguration of the north parking lot, 7.62 percent of the total parking and <br /> driving areas on the property will be occupied by planting islands, hence the applicant will be <br /> requiring flexibility in the future Phase 2 of the project. <br /> Zoning Code Proposed Future Total <br /> Phase I Phase 2 <br /> Percent(%) of Planting Islands 10%Min. 14.89% 5.9% 7.62% <br /> Square feet of Planting Islands 63,494 18,172 30,240 48,412 <br /> Square feet of Parking Lot -- 1 122,054 1 512,886 1 634,940 <br /> D. Off Street Parking Spaces—Meets Requirement <br /> The number of parking stalls required by the City Code is determined based on the type of <br /> land use proposed for a site. In this case, Land O'Lakes is classified as an office use and is <br /> required to provide one (1)parking space for each 250 square feet of gross floor area. <br /> Phase I of the project does not include any new structures and, therefore, no additional <br /> parking spaces are required. However, because the applicant is expanding their Campus in <br /> Phase 2 additional parking spaces are required by the City Code. In order to accommodate <br /> the proposed construction in Phase 2, the south parking lot is being expanded to provide a <br /> total of 267 parking spaces. <br /> With the proposed construction of the new 155,000 square foot four (4) story office structure <br /> in Phase 2, a total of 1,676 parking spaces are required by the Code. The applicant is <br /> proposing that 1,678 parking spaces be constructed between both phases and that an <br /> additional 461 proof-of-parking spaces be provided for future expansion. <br /> City of Arden Hills <br /> City Council Meeting for June 27, 2016 <br /> P:IPlanningWlanning Cases120161PC 16-014-Land O'Lakes-PUDWemos Reports_16-014 <br /> Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.