My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
06-27-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:52:59 AM
Creation date
11/3/2016 11:32:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The consolidation will bring approximately 900 employees currently located at the Shoreview site onto <br /> the Arden Hills campus.The estimated employee count after the consolidation in late 2018 will be <br /> approximately 2100 employees. <br /> Also included in the project is the renovation of approximately 138,000 square feet in the existing Arden <br /> Hills corporate building. The renovation will include the expansion of the corporate <br /> cafeteria/conference(approximately 20,000 sf.), reconfiguration of the loading dock area <br /> (approximately 11,000 sf.) and renovation of office areas (approximately 107,000 sf.) based on new <br /> workplace strategies. <br /> Existing Site and Past Approvals <br /> The project site contains two existing corporate campus buildings, surface parking lot with <br /> approximately 931 parking stalls, approximately 22.7 acres of wooded area, (approx. 31,636 cal. Inches <br /> of trees on site), open lawn areas and regional stormwater facilities. The following are descriptions of <br /> the existing uses on site: <br /> 1. Land O'Lakes east Headquarter building: Four story building, 56' in height, with a total of <br /> 201,300 gross floor area. <br /> 2. Land O'Lakes Research and Development building:Two story building, 28' feet in height, with <br /> the exception of a 3,000 sq. ft. element that will be 50 feet tall, and approximately 62,500 gross <br /> floor area. <br /> It should be noted that Land O'Lakes does not own the small triangular parcel (south-east corner of the <br /> Land O'Lakes site) at the north-west corner of the intersection of Lexington Avenue N. and the on-ramp <br /> for Highway 694 west. This parcel is owned by Roger J. Reiling and his trust. <br /> Past Approvals <br /> In 1979,the City of Arden Hills approved a Special Use Permit—Case No. 79-4 for the original PUD plan <br /> for the Land O'Lakes corporate headquarters site. A list of all of the processed planning cases for the <br /> project site are identified below: <br /> 1. Special Use Permit Agreement & Planned Unit Development: Planning Case 79-004 <br /> 2. Site Plan Review—Parking Lot Expansion: Planning Case 87-027 <br /> 3. Site Plan Review—Building Addition: Planning Case 88-028 <br /> Development Concept <br /> The overall design concept for the corporate headquarters consolidation project is based on the strong <br /> commitment that Land O'Lakes has to building strong communities, creating enduring livelihoods and <br /> being effective stewards of natural resources. The company has a strong track record working with its <br /> public and private partners to address everything from water quality and soil conservation to pollinator <br /> health. For this project, Land O'Lakes would like to reinforce these core values by constructing a new <br /> corporate building and related site improvements that is driven by best sustainable design practices and <br /> reinforces their strong commitment to land stewardship. <br />
The URL can be used to link to this page
Your browser does not support the video tag.