Laserfiche WebLink
1. Overall landscape coverage on the entire campus site (47.37 acres) is approximately 60%of the <br /> total site area. <br /> 2. Phase 1 (South Parking Lot) proposed landscape coverage is approximately 64.36%of the total <br /> area. <br /> 3. Phase 2 (North of existing buildings) proposed landscaping is approximately 57.25%of the total <br /> area. <br /> A new central courtyard of approximately 50,900 sf will be created as a part of the project.The <br /> courtyard will be located in the space that is created between the new and existing buildings. The <br /> central courtyard will be a flexible programmable space that will include a variety of meeting, dining and <br /> seating areas. The courtyard will be designed to include hardscaped and landscaped areas. Over story <br /> canopy trees will provide shaded areas for small informal gatherings, while open hardscaped plaza areas <br /> will provide areas for connectivity and larger gatherings. <br /> An outdoor playground of approximately 8,000 sf will be included to support the childcare functions. <br /> The playground will be designed to support use of children form the age of 3-12 years. The playground <br /> will include structured seating, resilient surfacing, native landscaping and other playground amenities. <br /> The playground will incorporate a fence along the western edge to secure the playground area from the <br /> adjacent corporate plaza space. <br /> Loading Dock/Delivery Area <br /> The loading dock area located on the north end of the current corporate building will be reconfigured to <br /> provide one additional semi-truck loading dock, and a relocated trash compactor and recycling container <br /> area. Current vehicular circulation in the delivery area will be maintained to support the expanded <br /> loading dock functions. <br /> Compliance with Current City of Arden Hills Zoning Code <br /> The proposed consolidation project is consistent with the adopted City of Arden Hills Comprehensive <br /> Plan and previously approved PUD -Case No. 79-4 for the project site. The current zoning for the <br /> existing and surrounding sites is 1-1 Limited Industrial District. All of the defined uses in the proposed <br /> project (credit union, childcare facility(over 10), medical clinic, and corporate workout facilities) are <br /> permitted uses within the district. Based on the surrounding zoning, the proposed consolidation project <br /> is visually compatible with adjacent land uses and does not impact the surrounding sites in a negative <br /> manner. <br /> The proposed Land O'Lakes Corporate Headquarters Consolidation project will exceed the current City <br /> of Arden Hills zoning requirements in numerous ways. Some of the specific zoning code requirements <br /> that will be exceeded include the following: <br /> 1. Currently within the 1-1 Limited Industrial District there are no requirements for indoor/outdoor <br /> bicycle storage. We are currently proposing 32 outdoor bicycle parking spots and have a design <br /> option for an additional 20 indoor bicycle parking spots. <br /> 2. Our proposed landscape for Phase 1 and 2 improvements is approximately 35%of the total site <br /> which exceeds the City requirement of 10%. <br />