Laserfiche WebLink
EROSION CONTROL NOTES: P E R K I N <br /> 1. ALL EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OPERATIONS. THE CITY ENGINEERING <br /> DEPARTMENT AND RICE CREEK WATERSHED DISTRICT MUST BE NOTIFIED UPON COMPLETION OF THE INSTALLATION OF THE <br /> REQUIRED EROSION CONTROL FACILITIES AND PRIOR TO ANY GRADING OPERATION BEING COMMENCED. THE CONTRACTOR IS + W I L <br /> RESPONSIBLE TO SCHEDULE A PRE-CONSTRUCTION GRADING MEETING ON-SITE WITH THE CITY AND RICE CREEK WATERSHED <br /> DISTRICT. IF DAMAGED OR REMOVED DURING CONSTRUCTION, ALL EROSION CONTROL FACILITIES SHALL BE RESTORED AND IN <br /> PLACE AT THE END OF EACH DAY. <br /> 84 10th St.South <br /> 2. ANY EROSION CONTROL FACILITIES DEEMED NECESSARY BY THE CITY OR RICE CREEK WATERSHED DISTRICT; BEFORE, DURING OR Suite 200 <br /> AFTER THE GRADING ACTIVITIES, SHALL BE INSTALLED AT THEIR REQUEST. Minneapolis,MN 55403 <br /> 3. NO DEVIATIONS SHALL BE MADE FROM THE ELEVATIONS SHOWN ON THE APPROVED GRADING PLAN, WITHOUT PRIOR APPROVAL t612.851.5000 <br /> FROM THE CITY. f 612.851.5001 <br /> 4. FOR SITES GREATER THAN 1.0 ACRE, AS REQUIRED BY THE MPCA PERMIT REQUIREMENTS, THE PERMIT APPLICANT MUST KEEP AN www.perkinswill.com <br /> EROSION CONTROL INSPECTION LOG. INSPECTION MUST BE MADE ONCE EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER EVERY CONSULTANTS <br /> RAIN EVENT. THE INSPECTION RECORD MUST BE MADE AVAILABLE TO THE CITY AND RICE CREEK WATERSHED DISTRICT WITHIN 24 <br /> HOURS OF REQUEST. <br /> CIVIL/STRUCTURAL <br /> 5. FLOWS FROM DIVERSION CHANNELS OR PIPES (TEMPORARY OR PERMANENT) SHALL BE ROUTED TO SEDIMENTATION BASINS OR <br /> APPROPRIATE ENERGY DISSIPATERS TO PREVENT TRANSPORT OF SEDIMENT TO OUTFLOW TO LATERAL CONVEYORS AND TO PREVENT <br /> EROSION AND SEDIMENTATION WHEN RUNOFF FLOWS INTO THESE CONVEYORS. <br /> 6. SITE ACCESS ROADS SHALL BE GRADED OR OTHERWISE PROTECTED WITH SILT FENCES, DIVERSION CHANNELS, OR DIKES AND PIPES BKBM <br /> TO PREVENT SEDIMENT FROM EXITING THE SITE VIA THE ACCESS ROADS. SITE-ACCESS ROADS/DRIVEWAYS SHALL BE SURFACED ENGINEERS <br /> WITH CRUSHED ROCK WHERE THEY ADJOIN EXISTING PAVED ROADWAYS. <br /> 7. SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES OR EQUIPMENT SHALL BE CLEANED DAILY FROM PAVED ROADWAY SURFACES, <br /> OR MORE FREQUENTLY IF REQUESTED BY CITY OR RICE CREEK WATERSHED DISTRICT, THROUGHOUT THE DURATION OF <br /> CONSTRUCTION. <br /> 8. DUST CONTROL MEASURES SHALL BE PERFORMED PERIODICALLY WHEN CONDITIONS REQUIRE AND/OR AS DIRECTED BY THE CITY 5930 Brooklyn Boulevard <br /> AND RICE CREEK WATERSHED DISTRICT. Minneapolis, MN 55429-2518 <br /> (763) 843-0420 Fax: (763) 843-0421 <br /> 9. ALL EROSION CONTROL MEASURES SHALL BE USED AND MAINTAINED FOR THE DURATION OF SITE CONSTRUCTION. IF w763) 84 -0421 <br /> CONSTRUCTION OPERATIONS OR NATURAL EVENTS DAMAGE OR INTERFERE WITH THESE EROSION CONTROL MEASURES, THEY SHALL <br /> BE RESTORED TO SERVE THEIR INTENDED FUNCTION AT THE END OF EACH DAY OR AS SOON AS FIELD CONDITIONS ALLOW <br /> ACCESS. <br /> 10. ALL CONSTRUCTION AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AS SOON AS POSSIBLE. ANY AREAS WHICH MICHAUD COOLEY <br /> HAVE BEEN FINISHED GRADED OR AREAS THAT HAVE BEEN DISTURBED AND FOR WHICH GRADING OR SITE BUILDING CONSTRUCTION ERICKSON <br /> OPERATIONS ARE NOT ACTIVELY UNDERWAY SHALL BE SEEDED AND MULCHED AS SET FORTH IN THE FOLLOWING PARAGRAPHS <br /> WITHIN 14 DAYS: 333 SOUTH SEVENTH STREET,SUITE 1200 <br /> A. ALL SEEDED AREAS SHALL BE EITHER MULCHED AND DISC-ANCHORED OR COVERED BY FIBROUS BLANKETS TO PROTECT MINNEAPOLIS,MN 55402 <br /> SEEDS AND LIMIT EROSION. TEMPORARY STRAW MULCH SHALL BE DISC-ANCHORED AND APPLIED AT A UNIFORM RATE OF www.michaudcooley.com <br /> NOT LESS THAN TWO TONS PER ACRE AND NOT LESS THAN 80% COVERAGE. P:612.339.4941 <br /> B. IF THE GRADED AREA IS ANTICIPATED TO BE RE-DISTURBED/DEVELOPED WITHIN SIX MONTHS, PROVIDE A TEMPORARY <br /> VEGETATIVE COVER CONSISTING OF MINNESOTA DEPARTMENT OF TRANSPORTATION (MNDOT) SEED MIXTURE 21-1 1 1 (OATS), <br /> OR 21-112 (WINTER WHEAT), AT A RATE OF 100 POUNDS PER ACRE. <br /> C. IF GRADED AREA WILL NOT BE DEVELOPED FOR A PERIOD GREATER THAN SIX MONTHS, PROVIDE A SEMI-PERMANENT <br /> VEGETATIVE COVER OF SEED MIXTURE MNDOT 22-112 AT A RATE OF 40 POUNDS PER ACRE. <br /> D. GRADING BONDS OR THE EQUIVALENT SECURITIES SHALL BE RETAINED UNTIL TURF HAS GERMINATED AND SURVIVED A <br /> 60-DAY GROWING PERIOD. <br /> E. UNLESS SPECIFIED ELSEWHERE WITHIN THE CONSTRUCTION DOCUMENTS (I.E. ARCHITECTURAL SITE PLAN OR LANDSCAPE <br /> PLAN), ALL AREAS THAT WILL NOT BE MOWED OR MAINTAINED AS PART OF THE ULTIMATE DESIGN WILL BE PERMANENTLY <br /> RESTORED USING SEED MIXTURE MNDOT 25-141 AT A RATE OF 59 POUNDS PER ACRE. <br /> F. UNLESS SPECIFIED ELSEWHERE WITHIN THE CONSTRUCTION DOCUMENTS (I.E. ARCHITECTURAL SITE PLAN OR LANDSCAPE <br /> PLAN), PERMANENT TURF RESTORATION SHALL CONSIST OF MN/DOT SEED MIXTURE 25-131 (COMMERCIAL TURF GRASS) AT <br /> A RATE OF 220 POUNDS PER ACRE. <br /> G. WHENEVER OTHER EROSION AND SEDIMENT CONTROL PRACTICES ARE INADEQUATE, TEMPORARY ON-SITE SEDIMENT BASINS <br /> THAT CONFORM TO THE CRITERIA FOR ON-SITE DETENTION BASINS SHALL BE PROVIDED. <br /> H. MULCH, HYDROMULCH, AND TACKIFIERS MAY NOT BE USED FOR STABILIZATION IN SWALES OR DRAINAGE DITCHES. <br /> 11. RUNOFF SHALL BE PREVENTED FROM ENTERING ALL STORM SEWER CATCH BASINS PROVIDING THEY ARE NOT NEEDED DURING <br /> CONSTRUCTION. WHERE STORM SEWER CATCH BASINS ARE NECESSARY FOR SITE DRAINAGE DURING CONSTRUCTION, A SILT FENCE <br /> OR SEDIMENT PROTECTION DEVICES AS DETAILED SHALL BE INSTALLED AND MAINTAINED AROUND ALL CATCH BASINS UNTIL THE <br /> TRIBUTARY AREA TO THE CATCH BASIN IS RESTORED. <br /> 12. GRADING ACTIVITIES PROPOSED TO BEGIN AFTER OCTOBER 15 WILL REQUIRE AN APPROVED PHASING SCHEDULE. THE AREA OF PU D <br /> LAND THAT THE CITY WILL ALLOW TO BE DISTURBED AT THIS TIME OF YEAR WILL BE SEVERELY LIMITED. THE CITY WILL ALSO APPLICATION <br /> REQUIRE ADDITIONAL EROSION CONTROL DEVISES, I.E., TEMPORARY SEDIMENT BASINS, DORMANT SEEDING AND HIGH RATES OF <br /> APPLICATION OF BOTH SEED AND MULCH. <br /> 13. FILTER BLANKET AND RIPRAP SHALL BE INSTALLED ON THE DOWNSTREAM SIDES OF ALL STORM SEWER OUTLETS 24 HOURS AFTER MAY 02, 2016 <br /> CONSTRUCTION AS INDICATED AND DETAILED. ALL RIPRAP SHALL BE INSTALLED WITH A FILTER MATERIAL MEETING THE MNDOT <br /> SPECIFICATIONS FOR RIPRAP AND FILTER MATERIAL. <br /> 14. EROSION CONTROL FACILITIES SHALL BE INSTALLED AND MAINTAINED AROUND THE PERIMETER OF ALL LAKES, PONDS AND <br /> WETLANDS WITHIN OR ADJACENT TO THE AREA TO BE GRADED UNTIL THE TRIBUTARY AREA TO THE LAKE, POND OR WETLAND IS <br /> RESTORED. <br /> 15. TO MINIMIZE EROSION, ALL 3:1 SLOPES SHALL BE COVERED WITH A MN/DOT 3885 CATEGORY 2 STRAW EROSION CONTROL <br /> BLANKETS OR STAKED SOD. <br /> 16. ACCUMULATION OF ALL SEDIMENT OCCURRING IN STORM SEWERS, DITCHES, LAKES, PONDS AND WETLANDS SHALL BE REMOVED <br /> PRIOR TO, DURING AND AFTER COMPLETION OF GRADING ACTIVITIES. <br /> 17. EROSION CONTROL ITEMS AND DEVICES SHALL BE REMOVED ONLY AFTER THE AREA HAS RECEIVED FINAL STABILIZATION OR AS NOT FOR <br /> DIRECTED BY THE CITY AND/OR RICE CREEK WATERSHED DISTRICT. CONSTRUCTION <br /> LAND O'LAKES <br /> HEADQUARTERS <br /> GRADING NOTES: CONSOLIDATION <br /> 1. THE CONTRACTOR SHALL VISIT THE SITE, REVIEW ALL CONSTRUCTION DOCUMENTS AND FIELD VERIFY THE EXISTING CONDITIONS <br /> PRIOR TO BIDDING. NO ADDITIONAL COMPENSATION WILL BE GIVEN FOR WORK THAT COULD HAVE BEEN IDENTIFIED BY A SITE VISIT <br /> OR CONSTRUCTION DOCUMENT REVIEW. <br /> 2. THE TOPOGRAPHIC BACKGROUND INFORMATION WAS PREPARED BY SUNDE LAND SURVEYING. (952) 881-2455. <br /> 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN THE LOCATION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY <br /> THE LOCATION, ELEVATION AND MARK ALL EXISTING UTILITIES 48 HOURS BEFORE CONSTRUCTION STARTS. THE ENGINEER, ARCHITECT <br /> OR OWNER DOES NOT GUARANTEE THAT ALL THE UTILITIES ARE MAPPED, OR IF MAPPED, ARE SHOWN CORRECTLY. CONTACT <br /> GOPHER ONE AT 651-454-0002 FOR FIELD LOCATING EXISTING UTILITIES. CONTACT UTILITY OWNER IF DAMAGE OCCURS DUE TO <br /> CONSTRUCTION. <br /> 4. PROTECT ALL EXISTING STRUCTURES AND UTILITIES WHICH ARE NOT SCHEDULED FOR REMOVAL. <br /> 5. NOTIFY CITY BUILDING INSPECTOR BEFORE TRENCHING AND EXCAVATION WORK COMMENCES. THE CONTRACTOR SHALL OBTAIN ALL <br /> APPLICABLE PERMITS PRIOR TO START OF CONSTRUCTION. <br /> 6. ALL SPOT ELEVATIONS SHOWN AS 62.20, FOR EXAMPLE, ARE TO BE UNDERSTOOD TO MEAN 962.20. <br /> 7. ALL SPOT ELEVATIONS ALONG THE CURB-LINE INDICATE THE ELEVATION OF THE GUTTER, UNLESS NOTED OTHERWISE. <br /> 8. NO LANDSCAPED SLOPES ARE TO EXCEED 3:1 (3 FEET HORIZONTAL TO 1 FOOT VERTICAL) UNLESS NOTED OTHERWISE. <br /> 9. ACCESSIBLE PARKING AREAS SHALL NOT HAVE SLOPES IN ANY DIRECTION THAT EXCEED 2%. <br /> 10. PROVIDE POSITIVE DRAINAGE FROM BUILDINGS AT ALL TIMES. <br /> 11. UPON COMPLETION OF THE GRADING AND UTILITY WORK, THE DEVELOPER SHALL CERTIFY THAT ALL GRADING AND UTILITY WORK <br /> WAS PERFORMED IN ACCORDANCE WITH THE APPROVED GRADING AND UTILITY PERMITS. AN AS-BUILT GRADING AND UTILITY PLAN <br /> SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND DISTRIBUTION. <br /> 12. PRIOR TO ISSUANCE OF BUILDING PERMITS, ALL NECESSARY EROSION CONTROL DEVICES MUST BE IN PLACE AND FUNCTIONING. LAND O'LAKES <br /> THE CITY AND RICE CREEK WATERSHED DISTRICT WILL INSPECT THE SITE TO DETERMINE ITS SUITABILITY FOR BUILDING ACTIVITIES. <br /> IF THE PUBLIC UTILITIES HAVE NOT BEEN INSTALLED AT THIS POINT, IT MAY BE NECESSARY TO WITHHOLD BUILDING PERMITS FOR 4001 Lexington Ave N. <br /> VARIOUS LOTS TO ALLOW THE CONTRACTOR ADEQUATE SPACE TO PERFORM THIS WORK. Arden HIIIS, MN 55126 <br /> 13. ALL DEBRIS CREATED IN THE PROCESS OF CLEARING AND GRADING THE SITE SHALL BE REMOVED FROM THE SITE. THIS INCLUDES <br /> TREES AND SHRUBS. UNDER NO CIRCUMSTANCES SHALL THIS TYPE OF MATERIAL BE BURIED OR BURNED ON THE SITE. KEYPLAN <br /> 14. THE INTENT IS TO STRIP AND SALVAGED TOPSOIL FOR POTENTIAL RE-SPREADING ON THE SITE, IF APPROVED BY THE LANDSCAPE <br /> ARCHITECT AND/OR SPECIFICATIONS. SIX INCHES OF TOPSOIL - AFTER COMPACTION - SHALL BE RE-SPREAD PRIOR TO SEEDING <br /> AND MULCHING. EXCESS TOPSOIL MAY BE REMOVED FROM THE SITE PROVIDING THERE IS ADEQUATE TOPSOIL REMAINING TO <br /> PROPERLY FINISH THE SITE AS NOTED ABOVE. THE TOPSOIL STRIPPING, STOCKPILING AND RE-SPREADING SHALL BE DONE IN <br /> ACCORDANCE TO, AND NOTED ON, THE APPROVED GRADING PLAN AND SPECIFICATIONS. THE CONTRACTOR SHALL REFER TO THE <br /> LANDSCAPE DRAWINGS AND SPECIFICATIONS FOR ANY SPECIAL TOPSOIL OR PLANTING REQUIREMENTS. <br /> 15. ALL GRADING OPERATIONS SHALL BE CONDUCTED IN A MANNER TO MINIMIZE THE POTENTIAL FOR SITE EROSION. EROSION <br /> CONTROL MEASURES SHALL BE INSTALLED TO PREVENT SEDIMENT FROM RUNNING OFF ONTO ADJACENT PROPERTIES. ANY DAMAGE <br /> TO ADJACENT PROPERTIES MUST BE CORRECTED AND RESTORED AS SOON AS PERMISSION IS GRANTED FROM THE ADJACENT <br /> PROPERTY OWNER(S). <br /> 16. IF CONSTRUCTION OF THE SITE WORK PROCEEDS THROUGH THE WINTER MONTHS, ANY DISTURBED AREAS OUTSIDE THE BUILDING <br /> FOOTPRINTS ARE TO BE MINIMALLY STABILIZED PRIOR TO MARCH 1, AS FOLLOWS: AREAS PLANNED TO RECEIVE PAVEMENTS ARE <br /> TO HAVE CLASS 5 BASE INSTALLED; ALL OTHER DISTURBED AREAS ARE TO BE SEEDED, STRAW MULCH PLACED, AND <br /> DISC-ANCHORED. <br /> 17. WINTER MULCHING: ISSUE CHART <br /> 17.A. SNOW MULCHING SHALL BE DEFINED AS MULCH MATERIAL SPREAD OVER THE TOP OF SNOW SO THAT THE MULCH MELTS <br /> THROUGH THE SNOW AND STICKS TO THE EXPOSED SOILS. IMARKI ISSUE DATE <br /> 17.B. FROZEN GROUND MULCHING SHALL BE DEFINED AS MULCH MATERIAL SPREAD OVER FROZEN GROUND. MULCH MATERIALS THAT <br /> DO NOT REQUIRE DISC-ANCHORING INTO THE SOIL MAY BE PLACED WITHOUT MODIFICATION. MULCH MATERIALS THAT REQUIRE <br /> DISC-ANCHORING MAYBE ANCHORED WITH HYDRAULIC SOIL STABILIZERS OR MAY BE FROZEN TO THE SOIL BY APPLYING <br /> WATER, AT A RATE OF 2000 GALLONS PER ACRE, OVER THE MULCH AS A SUBSTITUTION FOR DISC-ANCHORING. <br /> 18. RETAINING WALLS AND APPROPRIATE SAFETY FENCING ALONG THE TOP OF WALLS ARE TO BE DESIGNED AND CERTIFIED BY A <br /> REGISTERED PROFESSIONAL ENGINEER. SUBMIT RETAINING WALL SHOP DRAWINGS TO PROJECT TEAM PRIOR TO CONSTRUCTION. <br /> 19. THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA AS MUCH AS POSSIBLE. <br /> I hereby certify that this plan, specification <br /> or report was prepared by me or under <br /> my direct supervision and that I am a duly <br /> RETAINING WALL NOTES: Licensed Professional Engineer under the <br /> laws of the state of Minnesota. <br /> 1. ALL TOP AND BOTTOM ELEVATIONS CORRESPOND TO THE RESPECTIVE <br /> GRADE ELEVATIONS ON EACH SIDE OF THE WALL. <br /> 2. THE BOTTOM ELEVATION IS THE ELEVATION OF THE LOW-GRADE SIDE OF <br /> THE WALL, NOT THE TOP ELEVATION OF THE BURIED BLOCK COURSE OR KEVIN A.BOHL <br /> BOTTOM OF FOOTING. Date 05-02-2016 Lic.No. 52209 <br /> 3. ALL RETAINING WALLS SHALL HAVE PROTECTIVE FENCING AT THE TOP Job Number 15401 <br /> WHERE THE VERTICAL HEIGHT EXCEEDS 30 INCHES. REFER TO Drawn WH-NA <br /> ARCHITECTURAL AND LANDSCAPE PLANS AND SPECIFICATIONS. <br /> 4. MODULAR BLOCK RETAINING WALL SHALL BE DESIGNED AND CERTIFIED Checked TJC <br /> BY A LICENSED PROFESSIONAL ENGINEER. DESIGN CALCULATIONS AND Approved KAB <br /> SHOP DRAWINGS SHALL BE SUBMITTED TO THE OWNER AND ARCHITECT <br /> PRIOR TO CONSTRUCTION OF WALL. <br /> GRADING, DRAINAGE, <br /> AND EROSION CONTROL <br /> NOTES AND DETAILS <br /> CO2 =00 <br /> Copyright©2014 Perkins+Will <br />