Laserfiche WebLink
PROJECT NARRATIVE OTHER NOTES: MECHANICAL AND NON STORMWATER P E R K I N <br /> 1. LONG TERM MAINTENANCE OF THE SITE WILL DISCHARGES, EXISTING AND PROPOSED <br /> THE PROJECT IS LOCATED SOUTH OF COUNTY ROAD F WEST, BETWEEN HAMLINE AVENUE AND LEXINGTON BE PERFORMED BY LAND O'LAKES AS + W <br /> AVENUE NORTH. THE PROPERTY IS APPROXIMATELY 48.87 ACRES. THE APPROXIMATE DISTURBED AREA IS 22.9 OUTLINED IN THE RECORDED MAINTENANCE 1. WATER LINE FLUSHING I L L <br /> ACRES. THE EXISTING IMPERVIOUS AREAS, A BITUMINOUS PARKING LOT, AND CONCRETE SIDEWALKS, TOTAL AGREEMENT WITH RICE CREEK WATERSHED 2. LANDSCAPE IRRIGATION <br /> 0.65 ACRES. STORMWATER RUNOFF FROM THE EXISTING SITE SHEETS FLOWS TO THE SOUTHEAST WETLAND, DISTRICT. 3. DISCHARGE FROM POTABLE WATER SOURCES <br /> TO THE EXISTING ONSITE DRAINAGE POND, TO COUNTY ROAD F WEST, TO MN/DOT RIGHT OF WAY, AND TO 4. FOUNDATION DRAINS 84 10th St.South <br /> ONSITE RAIN GARDENS. 2. THIS SWPPP WAS PREPARED BY PERSONNEL 5. FLOWS FROM RIPARIAN HABITATS AND Suite 200 <br /> Minneapolis,MN 55403 <br /> . <br /> THE PROPOSED DEVELOPMENT INCLUDES THE CONSTRUCTION OF A BITUMINOUS PARKING AREA AND 6 STREET WASH WATERS THAT ARE CERTIFIED IN THE DESIGN OF WETLANDS Minnea p <br /> CONSTRUCTION SWPPPS. COPIES OF THE t 612.851.5000 <br /> SIDEWALKS. THE PROPOSED NEW/REDEVELOPED IMPERVIOUS AREA IS APPROXIMATELY 16.2 ACRES. 7. RESIDENTIAL BUILDING WASH WATERS WITHOUT <br /> STORMWATER RUNOFF FROM THE PARKING AREAS WILL BE DIRECTED TO ONSITE STORM SEWER. THE STORM CERTIFICATIONS ARE ON FILE WITH BKBM AND DETERGENTS. f 612.851.5001 <br /> SEWER DIRECTS STORMWATER TO FILTRATION TANK SYSTEMS LOCATED UNDER THE PARKING AREA. ARE AVAILABLE UPON REQUEST. www.perkinswill.com <br /> 3. THIS SWPPP DOCUMENT MUST BE AMENDED AS CONSULTANTS <br /> NECESSARY DURING CONSTRUCTION IN ORDER <br /> TO KEEP IT CURRENT WITH THE POLLUTANT <br /> civiusTRucTURaL <br /> CONTROL MEASURES UTILIZED AS THE SITE. <br /> - - -- THE SITE MAP SHOWING LOCATIONS OF ALL <br /> STORM WATER CONTROLS MUST BE POSTED ON <br /> THE SITE AND UPDATED TO REFLECT THE BKBM <br /> PROGRESS OF CONSTRUCTION. <br /> ENGINEERS <br /> # r V CONTACTS — — <br /> _ M -�- * CITY OF ARDEN HILLS <br /> POLLUTION PREVENTION ENGINEERING DEPARTMENT <br /> MANAGEMENT MEASURES PHONE: (651) 792-7800 5930 Brooklyn Boulevard <br /> P _ Minneapolis, MN 55429-2518 <br /> 1 SOLID WASTE DISPOSED PROPERLY; COMPLY WITH (763) 843-0420 Fax: (763) 843-0421 <br /> I r ~ MPCA REQUIREMENTS. MINNESOTA POLLUTION CONTROL AGENCY <br /> WON <br /> r * HAZARDOUS WASTE STORED (SECONDARY PHONE: (651) 296-6300 www.bkbm.com <br /> I, �* A+or- � - CONTAINMENT, RESTRICTED ACCESS) AND DISPOSED <br /> p ,+ IN COMPLIANCE WITH MPCA REQUIREMENTS. RICE CREEK WATERSHED DISTRICT MICHAUD COOLEY <br /> EXTERNAL WASHING OF TRUCKS AND OTHER PHONE: (763) 398-3070 ERICKSON <br /> CONSTRUCTION VEHICLES MUST BE LIMITED TO A <br /> DEFINED AREA OF THE SITE. RUNOFF MUST BE OWNER 333 SOUTH SEVENTH STREET,SUITE 1200 <br /> wt - CONTAINED AND WASTE PROPERLY DISPOSED. LAND ND OEXINGTON AVE. N. MINNEAPOLIS,MN 55402 <br /> - NO ENGINE DEGREASING ALLOWED ON—SITE. www.michaudcooley.com <br /> 4 ARDEN HILLS, MN 55126 y <br /> * y CONCRETE WASHOUT ON—SITE: ALL LIQUID AND PHONE: (651) 375-2222 P:612.339.4941 <br /> L SOLID WASTES GENERATED BY CONCRETE WASHOUT <br /> '• ' ' '" OPERATIONS MUST BE CONTAINED IN A <br /> LEAK—PROOF CONTAINMENT FACILITY OR <br /> IMPERMEABLE LINER. A COMPACTED CLAY LINER <br /> y THAT DOES NOT ALLOW LIQUIDS TO ENTER GROUND <br /> WATER IS CONSIDERED AN IMPERMEABLE LINER. THE NOTE: <br /> LIQUID AND SOLID WASTES MUST NOT CONTACT THE THE CONTRACTOR MUST COMPLETE, SIGN, OBTAIN <br /> GROUND, AND THERE MUST NOT BE RUNOFF FROM OWNERS SIGNATURE, PAY FEE, AND SEND IN THE <br /> THE CONCRETE WASHOUT OPERATIONS OR AREAS. NPDES PERMIT APPLICATION. CONTRACTOR SHALL <br /> � _ TLIQUID AND SOLID WASTES MUST BE DISPOSED OF PROVIDE A CERTIFIED EROSION CONTROL <br /> ' r PROPERLY AND IN COMPLIANCE WITH MPCA SUPERVISOR. SWPPP DOCUMENTATION, INCLUDING <br /> IL REGULATIONS. A SIGN MUST BE INSTALLED INSPECTION REPORTS SHALL BE RETAINED FOR A <br /> ADJACENT TO EACH WASHOUT FACILITY TO INFORM PERIOD OF THREE (3) YEARS. DESIGN <br /> All' <br /> T y - CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE CALCULATIONS ARE ON FILE AT BKBM. <br /> PROPER FACILITIES. THE CONCRETE WASHOUT AREA <br /> INDICATED ON THE PLANS IS SHOWN IN AN THE OWNER AND CONTRACTOR ARE RESPONSIBLE <br /> ' APPROXIMATE LOCATION. PRIOR TO THE START OF FOR IMPLEMENTATION OF THE SWPPP AND <br /> ` *'• � � °�l CONSTRUCTION, THE CONTRACTOR SHALL DETERMINE INSTALLATION, INSPECTION, AND MAINTENANCE OF <br /> THE EXACT LOCATION IN ACCORDANCE WITH MPCA THE EROSION PREVENTION AND SEDIMENT <br /> I; ! REQUIREMENTS. CONTROL AFTER <br /> CONSTRUCTIONS� O RE, DURING, D UNTILTHE NOTICE OF TERMINATION <br /> HAS BEEN FILED. <br /> 000 <br /> _ A <br /> 4 <br /> LIL ft Im.0. PUD <br /> HANDLING AND STORAGE OF HAZARDOUS <br /> MATERIALS: STOCKPILES: APPLICATION <br /> SITE MAP IF THE CONTRACTOR INTENDS TO USE POLYMERS, ON—SITE STOCKPILES OF SOIL SHALL HAVE MAY 02 2016 <br /> FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT PERIMETER SEDIMENT CONTROL. STOCKPILES SHALL 7 <br /> CHEMICALS ON THE PROJECT SITE, THE BE STABILIZED WITH BLANKETS, TARPS, OR HYDRO <br /> A R D E N HI S , M N CONTRACTOR MUST COMPLY WITH THE FOLLOWING MULCH IF LEFT ON—SITE FOR MORE THAN 7 DAYS. <br /> MINIMUM REQUIREMENTS: <br /> SPECIAL AND IMPAIRED WATERS 1. THE CONTRACTOR MUST USE CONVENTIONAL <br /> EROSION AND SEDIMENT CONTROLS PRIOR TO <br /> THESE SPECIAL AND IMPAIRED WATERS ARE CHEMICAL ADDITION TO ENSURE EFFECTIVE <br /> LOCATED WITHIN ONE MILE (AERIAL RADIUS) OF TREATMENT. CHEMICALS MAY ONLY BE APPLIED TEMPORARY SEDIMENT BASINS: <br /> THE PROJECT LIMITS AND RECEIVE RUNOFF FROM WHERE TREATED STORMWATER IS DIRECTED TO A TEMPORARY SEDIMENT BASINS SHALL BE PROVIDED <br /> THE PROJECT SITE. DUE TO THE PROXIMITY OF SEDIMENT CONTROL SYSTEM WHICH ALLOWS FOR PER APPENDIX A, SECTION C.1.8 OF THE MPCA <br /> THESE SPECIAL ADN IMPAIRED WATERS, THE BMPS FILTRATION OR SETTLEMENT OF THE FLOC PRIOR GENERAL STORMWATER PERMIT. NOT FOR <br /> DESCRIBED IN APPENDIX A OF THE NPDES PERMIT TO DISCHARGE. <br /> WILL APPLY TO ALL AREAS OF THE SITE. 2. CHEMICALS MUST BE SELECTED THAT ARE ENGINEER ANTICIPATES THAT, PRIOR TO CONSTRUCTION <br /> APPROPRIATELY SUITED TO THE TYPES OF SOILS INSTALLATION OF FILTRATION MEDIA AND DRAIN TILE, <br /> WATERBODY IMPAIRMENT(S) LIKELY TO BE EXPOSED DURING CONSTRUCTION, CONTRACTOR WILL USE PROPOSED FILTRATION <br /> NUTRIENT/EUTROPHICATION AND TO THE EXPECTED TURBIDITY, PH AND BASINS AS TEMPORARY SEDIMENT BASINS. <br /> VALENTINE LAKE BIOLOGICAL INDICATORS FLOW RATE OF STORMWATER FLOWING INTO THE CONTRACTOR SHALL EXCAVATE TEMPORARY BASINS <br /> MERCURY IN FISH TISSUE, CHEMICAL TREATMENT SYSTEM OR AREA. AND CLAY LINE PRIOR TO USE. SURFACE WATER <br /> SHALL BE REMOVED BY SKIMMER DEVICE SUCH AS <br /> ISLAND LAKE NUTRIENT/EUTOPHICATION LAND O'LAKES <br /> 3. CHEMICALS MUST BE USED IN ACCORDANCE FAIRCLOTH SKIMMER OR THIRST DUCK, OR USING A <br /> BIOLOGICAL INDICATORS WITH ACCEPTED ENGINEERING PRACTICES, AND SEDIMENT BASINSFILTER. <br /> ALTELL RNATIVE <br /> TEMPORARY D BY HEADQUARTERS <br /> WITH DOSING SPECIFICATIONS AND SEDIMENT ENGINEER PRIOR TO USE. <br /> REMOVAL DESIGN SPECIFICATIONS PROVIDED BY CONSOLIDATION <br /> THE MANUFACTURER OR PROVIDER/SUPPLIER OF IN LIEU OF USING TEMPORARY SEDIMENT BASINS, <br /> THE APPLICABLE CHEMICALS. THE CONTRACTOR MAY PHASE THEIR CONSTRUCTION <br /> ON—SITE FUEL TANKS REQUIRE SECONDARY SO THAT NOT MORE THAN 5 ACRES OF AREA IS <br /> CONTAINMENT AS REQUIRED BY THE PERMIT. DISTURBED AT ONE TIME. FULL STABILIZATION OF <br /> PORTABLE FUEL TRUCKS SHALL HAVE THEIR SPILL THE DISTURBED AREA IS REQUIRED PRIOR TO <br /> KITS AVAILABLE DURING FUELING. SPILLS GREATER DISTURBING ADDITIONAL AREAS. <br /> THAN 5 GALLONS MUST BE REPORTED TO THE <br /> PROPER AUTHORITIES. <br /> CONSTRUCTION ACTIVITY EROSION <br /> PREVENTION PRACTICES <br /> NOTE: CONTRACTOR SHALL STABILIZE ALL EXPOSED SOIL <br /> AREAS (INCLUDING STOCKPILES). STABILIZATION <br /> THE STORM WATER POLLUTION PREVENTION PLAN MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL <br /> FOR THIS PROJECT INCLUDES THE CIVIL EROSION WHENEVER ANY CONSTRUCTION ACTIVITY <br /> ENGINEERING PLANS AND THE PROJECT MANUAL. HAS PERMANENTLY OR TEMPORARILY CEASED ON <br /> CONTRACTOR TO SUPPLY CONSTRUCTION PHASING ANY PORTION OF THE SITE AND WILL NOT RESUME <br /> FOR A PERIOD EXCEEDING 7 CALENDAR DAYS. <br /> NARRATIVE, ESTIMATED PRELIMINARY QUANTITIES OF <br /> STABILIZATION MUST BE COMPLETED NO LATER <br /> ALL EROSION PREVENTION AND SEDIMENT CONTROL <br /> BMP'S ANTICIPATED AT THE START OF THE THAN 7 CALENDAR DAYS AFTER THE <br /> PROJECT AND FOR THE LIFE OF THE PROJECT, CONSTRUCTION ACTIVITY IN THAT PORTION OF THE <br /> SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br /> AND LOCATION OF AREAS WHERE CONSTRUCTION LAND O'LAKES <br /> WILL BE PHASED TO MINIMIZE DURATION OF FOR PUBLIC WATER THAT THE DNR HAS <br /> EXPOSED SOIL AREAS. CONTRACTOR IS TO PROMULGATED "WORK IN WATER RESTRICTIONS" 4001 Lexington Ave N. <br /> REVIEW MINNESOTA POLLUTION CONTROL AGENCY'S g <br /> INSTRUCTIONS FOR THE APPLICATION FOR DURING SPECIFIED FISH SPAWNING TIME FRAMES, <br /> MINNESOTA's NPDES/SDS GENERAL STORMWATER ALL EXPOSED SOIL AREAS THAT ARE WITHIN 200 Arden Hills, MN 55126 <br /> PERMIT FOR CONSTRUCTION ACTIVITY PRIOR TO FEET OF THE WATER'S EDGE, AND DRAIN TO KEYPLAN <br /> SUBMITTING APPLICATION. THESE WATERS MUST COMPLETE THE STABILIZATION <br /> ACTIVES WITHIN 24 HOURS DURING THE <br /> RESTRICTION PERIOD. <br /> PIPE OUTLETS MUST BE PROVIDED WITH <br /> TEMPORARY OR PERMANENT ENERGY DISSIPATION <br /> GRADING & SOILS WITHIN 24—HOURS AFTER CONNECTION TO A <br /> BASED ON SOIL BORING(S) PROVIDED BY AMERICAN SURFACE WATER. <br /> ENGINEERING TESTING SOILS TYPICALLY FOUND ON SEDIMENT CONTROL MEASURES MUST BE INSTALLED <br /> THIS PROJECT ARE: SM, SC, AND CL ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY <br /> UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. <br /> REFER TO THE GEOTECHNICAL REPORT FOR <br /> ADDITIONAL INFORMATION. <br /> INSPECTIONS ISSUE CHART <br /> SEDIMENT AND EROSION CONTROL EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND <br /> MAINTENANCE WITHIN 24 HOURS FOLLOWING A 1/2 INCH OVER MARK ISSUE I DATE <br /> PERIMETER SEDIMENT CONTROL PRACTICES: WHEN 24 HOURS RAIN EVENT. <br /> SEDIMENT REACHES 1/3 THE HEIGHT OF THE STABILIZED AREAS: ONCE EVERY 30 DAYS. <br /> BMP, THE SEDIMENT MUST BE REMOVED WITHIN FROZEN GROUND: AS SOON AS RUNOFF OCCURS <br /> 24 HOURS. IF PERIMETER SEDIMENT CONTROL OR PRIOR TO RESUMING CONSTRUCTION. <br /> HAS BEEN DAMAGED OR IS NOT FUNCTIONING RECORDS: A COPY OF THE GRADING, DRAINAGE <br /> PROPERLY, IT MUST BE REPAIRED AND/OR EROSION CONTROL PLAN AND WATERSHED DATA & <br /> REPLACED WITHIN 24 HOURS. PERIMETER BMP SWPPP PLANS AS WELL AS THE <br /> MEASURES MAY INCLUDE SILT FENCING. INSPECTIONS/MAINTENANCE LOGS ARE TO BE KEPT <br /> CONSTRUCTION SITE VEHICLE EXIT LOCATIONS: EITHER IN THE FIELD OFFICE, INSPECTOR'S <br /> ALL TRACKED SEDIMENT ONTO PAVED SURFACES VEHICLE OR CONTRACTOR'S VEHICLE. I hereby certify that this plan, specification <br /> MUST BE REMOVED WITHIN 24 HOURS OF or report was prepared by me or under <br /> DISCOVERY OR MORE FREQUENTLY IF REQUIRED direct supervision and that I am a dui <br /> BY CITY OR WATERSHED. m y su p y <br /> CONSTRUCTION SITE DEWATERING: Licensed Professional Engineer under the <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR PORTABLE TOILET NOTES: laws of the state of Minnesota. <br /> OBTAINING ALL DEWATERING PERMITS. DISCHARGE <br /> FROM ALL DEWATERING OPERATIONS SHALL BE 1. PORTABLE TOILETS POSE AN ENVIRONMENTAL <br /> DIRECTED TO ON—SITE DEPRESSIONS. NO HAZARD WHEN PLACED IN THE VICINITY OF <br /> DISCHARGE FROM DEWATERING OPERATIONS SHALL STORM DRAINS OR BODIES OF WATER. <br /> BE DIRECTED OFF—SITE TOWARDS A WATER OF PORTABLE TOILET CLEANING ACTIVITIES CAN KEVIN A.BOHL <br /> THE STATE. ALSO GENERATE POLLUTANTS THAT CAN Date 05-02-2016 Lic.No. 52209 <br /> DEGRADE WATER QUALITY. Job Number 15401 <br /> 2. PORTABLE TOILET PLACEMENT: <br /> 2.1. PLACE PORTABLE TOILETS ON FLAT STABLE Drawn WH-NA <br /> GROUND WITH CLEAR ACCESS TO THE <br /> FINAL STABILIZATION UNITS. Checked TJC <br /> STABILIZATION BY UNIFORM PERENNIAL 2.2. LOCATE TOILETS A MINIMUM OF 20 FEET Approved KAB <br /> VEGETATIVE COVER (70% DENSITY) FROM ANY WATER BODY AND 10 FEET <br /> FROM ANY CURB AND GUTTER. IF <br /> DRAINAGE DITCHES STABILIZED. UNFEASIBLE, AN EARTHERN BERM OR SAND <br /> ALL TEMPORARY SYNTHETIC AND STRUCTURAL BAG BERM SHALL BE PLACED AROUND THE STORM WATER <br /> BMP'S REMOVED. UNIT FOR SPILL AND LEAK CONTAINMENT. <br /> C 2.3. AVOID PLACING TOILETS ON IMPERVIOUS <br /> LEAN OUT SEDIMENT FROM CONVEYANCES AND POLLUTION <br /> SURFACES THAT WILL QUICKLY DRAIN TO <br /> SEDIMENTATION BASINS (RETURN TO DESIGN STORM SEWERS. PREVENTION PLAN <br /> CAPACITY). 2.4. LOCATE TOILETS SO THAT EXPOSURE TO <br /> TRAFFIC AND MOVING EQUIPMENT IS <br /> MINIMIZED. <br /> 2.5. SECURE TOILETS TO THE GROUND WITH <br /> STAKES OR CABLES. <br /> 2.6. RINSE WATER FROM CLEANING ACTIVITIES <br /> SHALL NOT BE DISPOSED ON SITE. <br /> 3. REGULARLY CHECK TOILETS FOR DAMAGE, C05=00 <br /> LEAKS AND SPILLS AS PART OF THE WEEKLY <br /> STORMWATER SITE INSPECTION. <br /> 4. OWNER IDENTIFICATION AND CONTACT <br /> INFORMATION SHALL BE DISPLAYED IN A <br /> PROMINENT LOCATION ON EACH UNIT. <br /> Copyright©2014 Perkins+Will <br />