Laserfiche WebLink
AGENDA ITEM – 8A <br /> <br />City of Arden Hills <br />City Council Meeting for November 14, 2016 <br /> <br /> P:\Planning\Planning Cases\2016\PC 16-024 - Arden Plaza - 1150 County Road E - Final PUD\Memos_Reports_16-024\CC Memo_(11-14- <br />16)_16-024.docx <br />Page 2 of 2 <br />parking lot to the access drive crossing. This option would avoid the stormwater grate but would <br />require replacing a section of concrete drainage channel and installing a new channel that would <br />support a grate to continue the sidewalk. Option 2 is providing a sidewalk from the northeast <br />corner of the Red Cross parking lot to the sidewalk on the south side of County Road E. From <br />that point, residents can cross the access drive and continue south on the existing sidewalk on the <br />east side of the access drive. Staff provided this second option because it would be clearly <br />visible from the customer parking lot and Red Cross entrance. The Option 1 sidewalk is not <br />visible from the Red Cross entrance and is located adjacent to the staff parking area and the staff <br />entrance to the Red Cross. <br /> <br />The two sidewalks options are illustrated in Attachment B. Each of the sidewalk options are <br />estimated to cost between $4,000 and $6,000. Staff is requesting that the Council review the <br />sidewalk options and direct staff if the Council wishes to pursue either option. Based on the <br />direction provided, staff will bring a revised Final PUD Agreement to the City Council meeting <br />on November 28, 2016 for the Council’s consideration. <br /> <br /> <br />Attachments <br />A. Final PUD Development Agreement – Phase 2 Arden Plaza <br />B. Sidewalk Options