Laserfiche WebLink
Capital Improvement Plan 2017 thru 2021 Department Equipment <br /> City of Arden Hills, Minnesota Contact Public Works Director <br /> Type Equipment <br /> Project# 19-Eqp-002 Useful Life 20-25 <br /> Project Name Add Generator Lift station emergency power Category Equipment:Public Works <br /> Priority 3Important <br /> Total Project Cost: $40,000 <br /> Description <br /> Add 100 KW mobile generator for lift station backup power <br /> Justification <br /> Lift Station 11 was reconstructed in 2016 and a fenced pad for a backup generator was created. The electrical panel was wired to provide the <br /> ability to add a generator in this location. With 14 lift stations through out the city there is a need for backup power source to avoid sewage <br /> backups during power outages. <br /> Expenditures 2017 2018 2019 2020 2021 Total <br /> EquipNehicles/Furnishings 40,000 40,000 <br /> Total 40,000 40,000 <br /> Funding Sources 2017 2018 2019 2020 2021 Total <br /> Sanitary Sewer Utility Fund 40,000 40,000 <br /> Total 40,000 40,000 <br /> Budget Impact/Other <br /> Produced Using the Plan-It Capital Planning Software Wednesday,November 16,2016 <br /> 53 <br />