Laserfiche WebLink
Capital Improvement Plan 2017 thru 2021 Department Water Department <br /> City of Arden Hills, Minnesota Contact Public Works Director <br /> Type Unassigned <br /> Project# 13-W-001 Useful Life 30 <br /> Project Name Valve Replacement Program Category Utility Maintenance <br /> Priority 3Important <br /> Total Project Cost: $750,000 <br /> Description <br /> Much of the City's water system was built in the 1960's through 1980's and with the City's"hot soils"there have been many failure of valves in the <br /> water system.Failures have ranged from deterioriated bolts to mechanical failure.Most valves have been replaced on an emergency basis thus far. <br /> This item is an attempt at planning for a certain amount of valve repair/repalcement on an annual basis.It is estimated that over the next 20 years as <br /> many as 175 existing valves will need to be repaired/replaced in our system.It is also estimated that the cost per valve will average$4000 per valve <br /> over the 20 years. <br /> Justification <br /> Prior Expenditures 2017 2018 2019 2020 2021 Total Future <br /> 1—20—,00-0-1 Construction/Maintenance 30,000 35,000 35,000 35,000 35,000 170 000 F 460,000 <br /> Total Total 30,000 35,000 35,000 35,000 35,000 170,000 Total <br /> Prior Funding Sources 2017 2018 2019 2020 2021 Total Future <br /> 12000 Water Utility Funds 30,000 35,000 35,000 35,000 35,000 170,000 460,000 <br /> Q <br /> Total Total 30,000 35,000 35,000 35,000 35,000 170,000 Total <br /> Budget Impact/Other <br /> Wednesday,November 16,2G16 <br /> Produced Using the Plan-It Capital Planning Sofhvare <br /> 112 <br />