Capital Improvement Plan 2017 thru 2021 Department Street Department <br /> City of Arden Hills, Minnesota Contact Public Works Director <br /> Type Improvement <br /> Project# 17-Str-004 Useful Life 20-25 <br /> Project Name Old Snelling Ave including Bridge Reconstruction Category Streets:Reconstruction <br /> Priority 3Important <br /> Total Project Cost: $1,750,000 <br /> Description <br /> The existing roadway has a minimal storm water management system in place. Records indicate that Snelling Avenue was crack sealed and seal <br /> coated in 1996. City staff will televise the utility lines to determine the extent of any necessary repairs. <br /> A preliminary Scoping Document was prepared in December 2010,Several options for reconstruction were discussed.No major sanitary sewer or <br /> water problems were identified. <br /> There is a bridge at the south end that will need to be replaced at the same time.Final bridge plans have been completed and are submitted to <br /> MnDOT requesting Bridge Bonding funds <br /> Snelling Ave (Co Rd E-TH51) <br /> Estimated Residential Equivalent Units:24 <br /> 2005 AADT: 1650 <br /> 2009 AADT:950 <br /> Note:Council authorized Bridge final plans in late 2011,in March 2012 Council decided street and bridge should be done together after Bridge <br /> Bonding Funds are secured.Earliest this could be accomplished is in 2013.5/21/12 TJM <br /> Bridge Bonding request submitted July of 2015 since won't be rebuilt at least until after 2015 replacement of CR E bridge over TH 51.TJM <br /> Curnmin s Lane and Hamline Ave.north of Co.Rd.E could be easily added to this project for reclaiming of the road surface. <br /> Justification <br /> Records indicate Snelling Avenue was crack sealed and sealcoated in 1996.The existing roadway currently has a minimal storm water <br /> management system in place. <br /> Snelling from TH51 to Co Rd E,2005 PCI=34,2008 PCI=31,2011 PCI= (Increase due to heavy patching) <br /> Utilities <br /> Watermain-no history of problems <br /> Sanitary Sewer-no history of problems,install chimney seals on all manholes;correct any I&I deficiencies. <br /> Storm Sewer-project must meet Rice Creek Watershed District requirements;improvements will improve water quality to Lake Johanna. <br /> In order to better understand the project costs for this road segment,staff completed a field survey and some preliminary analysis for this project in <br /> 2010. Results of the survey and knowledge of existing conditions will assist in determining potential rehabilitation measures and associated <br /> construction cost estimates.The level of improvement will determine the storm water requirements. <br /> Although this roadway has a low ADT it will likely be a significant detour when the CR E bridge is replaced in 2014 or 2015.In its current <br /> condition Snelling Ave will not likely hold up under increase traffic during the CR E bridge replacement. This segment is also listed as a PTRC <br /> high priority for a detached trail(Segment 1). <br /> Expenditures 2017 2018 2019 2020 2021 Total <br /> Construction/Maintenance 1,750,000 1,750,000 <br /> Total 1,750,000 1,750,000 <br /> Funding Sources 2017 2018 2019 2020 2021 Total <br /> Capital Improvement Funds 250,000 250,000 <br /> (PIR) <br /> Grant Revenue 125,000 125,000 <br /> Produced Using the Plan-It Capital Planning Software <br /> Wednesday,November 16,2016 <br /> 22 <br />