Laserfiche WebLink
Capital Improvement Plan 2017 thru 2021 Department Water Department <br /> City of Arden Hills, Minnesota Contact Public Works Director <br /> Type Operational Maintenance <br /> Project# 12-w-001 Useful Life 15-17 <br /> Project Name water Towers Repair and Repainting Category Utility Maintenance <br /> Priority 3Important <br /> Total Project Cost: $900,000 <br /> Description <br /> The City has two water towers;a 500,000 gallon north tower and a 1,000,000 gallon south tower.Based on a 2005 inspection report some <br /> improvements are needed at the south tower.The north tower was last inspected in 2000 and repairs were undertaken in 2001. <br /> In 2012 both water towers were inspected inside and outside using the"float down"method by Kollmer Consultants,inc of Stacy MN.Based upon <br /> these inspections the recommendation is to make minor structural modifications to each of towers together with a complete stripping of the existing <br /> paint and a full repainting.Kollmer recommended that the south water tower be completed in the next 1 to 2 years and the north water tower be <br /> completed in the next 2 to 3 years. <br /> Note:7/21/14 Council Worksession moved to 2016 due to TCAAP workload in 2015. <br /> Note:6/4/15 Increased Cost to$900K due to rising construction costs <br /> Justification <br /> In order to proceed with the repairs at the both towers plans and specs need to be prepared based on most recent inspection of the towers by <br /> Kollmer Consultants in 2012. <br /> Expenditures 2017 2018 2019 2020 2021 Total <br /> Construction/Maintenance 900,000 900,000 <br /> Total 900,000 900,000 <br /> Funding Sources 2017 2018 2019 2020 2021 Total <br /> Water Utility Funds 900,000 900,000 <br /> Total 900,000 900,000 <br /> Budget Impact/Other <br /> Produced Using the Plan-It Capital Planning Sofhvare Wednesday,November 16,2016 <br /> 32 <br />