Laserfiche WebLink
Capital Improvement Plan 2017 thru 2021 Department Water Department <br /> City of Arden Hills, Minnesota Contact Public Works Director <br /> Type Improvement <br /> Project# 16-W-001 Useful Life 30 <br /> Project Name TCAAP New Booster Station Category Utility Improvements <br /> Priority 3Important <br /> Total Project Cost: $1,000,000 <br /> Description <br /> This item ssu euld construct an zone.The boosterstationl Water Booster would be built on excessss Ran nearmsey Cld tghway 10 and 1-694 to ounty right of way and the structure water from the low pressure zonew would be made to look like a the <br /> high p <br /> residential house due to its location. <br /> Justification <br /> The City's water system currently only has one booster station providing water to the high pressure zone through a single crossing of i-694.If <br /> anything(lighting strike,wind storm,etc.)knocked out the current booster station for any length on time the high pressure zone could be out of <br /> water after the the half million gallon tower is drained. <br /> Construction of a second booster station will provide needed redundancy in the system so if one booster station fails or is taken down for service <br /> the high pressure zone will still be provided water. <br /> Expenditures 2017 2018 2019 2020 2021 Total <br /> 1,000,000 <br /> Construction/Maintenance 1,000,000 <br /> 1,000,000 <br /> Total <br /> 1,000,000 <br /> Funding Sources 2017 2018 2019 2020 2021 Total <br /> 600,000 <br /> TCAAP Reimbursements 600,000 400,000 <br /> Water Utility Funds 400,000 <br /> 1,000,000 <br /> Total <br /> 1,000,000 <br /> Budget Impact/Other <br /> Wednesday,November 16,2016 <br /> Produced Using the Plan-It Capital Planning Sofilvare <br /> 35 <br />