Laserfiche WebLink
City of Arden Hills, Minnesota <br /> Capital Improvement Plan <br /> 2017 thru 2021 <br /> PROJECTS BY CATEGORY <br /> Category Project# Priority 2017 2018 2019 2020 2021 Total <br /> Equipment: Public Works <br /> Replace 1997 Street Sweeper(Unit 103) 13-Eqp-004 3 250,000 2 ,000 <br /> 40 <br /> Large Area Mower(Unit 433) 16-Eqp-001 3 40,000 40,000 <br /> 1996 Trailer Replacement(SkidsteerlRoller) 16-Eqp-003 4 10,000 29,500 <br /> 00 <br /> Replace Air Compressor(Unit 107) 16-Eqp-004 4 29,500 10,0 <br /> 17-E 001 4 10,000 , 00 <br /> Replace 2006 Felling Trailer(Unit 415) 4P- 38 38,500 <br /> Brush Chipper(Unit 426) 17-Eqp-005 4 38,500 <br /> Add Two Toro"Z"Lawn Mowers(TCAAP) 18-Eqp-001 3 17,000 18,000 35,000 <br /> ,000 <br /> 10 <br /> Replace 2005 Felling Trailer Unit(414) 18-Eqp-002 4 10,000 10,000 <br /> Replace Two 2014 Toro"Z"Lawn Mowers(451 &452) 18-Eqp-003 3 24,000 <br /> 00 <br /> ,100 <br /> Add Felling Trailer(TCAAP) 18-Eqp-004 3 10,000 40,000 <br /> Replace 1996 Roller(unit 106) 18-Eqp-005 3 41,500 <br /> Replace Easement Sewer Cleaning Machine(Unit 310) 19-Eqp-001 3 70,000 70,000 <br /> Add Generator Lift station emergency power 19-Eqp-002 3 40,000 <br /> 40,000 <br /> Equipment:Public Works Total <br /> 408,000 75,500 107,000 18,000 608,500 <br /> Vehicles <br /> 17-E V 004 3 35,000 35,000 <br /> Add Pick-up Truck(TCAAP) gP - 72,000 <br /> Replace 2002 F-450 One Ton Truck(Unit 302) 17-EgpV-001 3 72,000 272,000 <br /> Replace 2001 Dump Truck with New Dump Truck(116) 17-EgpV-002 3 125,000 115,000 240,000 <br /> Add Plow Truck wlPlow,Wing and Sander(TCAAP) 18-EgpV-001 4 125,000 125,000 <br /> Add One-Ton Truck wlPlow and Sander(TCAAP) 18-EgpV-002 4 82,000 82,000 <br /> ,000 <br /> 000 42 <br /> Add F350 Pick-up with Lift Gate(TCAAP) 18-EgpV-003 4 42, 4 ,000 <br /> Add Pick-up Truck(TCAAP) 18 Eqpt/004 3 40,000 <br /> 55,000 55,000 <br /> Replace 2006 F-350 Four Dr w/traffic sign(#322) 18-EgpV-005 3 55,000 <br /> Replace 2008 F-350 Pick-up wlplow(unit 430) 19-Eqpt/-002 4 55,000 <br /> 232,000 170,000 302,000 167,000 871,000 <br /> Vehicles Total <br /> Vehicles-Community Development <br /> Replace 2004 Chevrolet Blazer(unit 502)-CD 18-EgpV-006 3 <br /> 29,000 29,000 <br /> Vehicles-Community Development Total <br /> 29,000 29,000 <br /> GRAND TOTAL 640,000 274,500 409,000 167,000 18,000 1,508,500 <br /> Wednesday,November 16,2016 <br /> Produced Using the Plan-It Capital Planning Sofhvare <br /> 39 <br />