My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-16-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
11-28-16-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 4:37:29 PM
Creation date
11/23/2016 4:31:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />DATE: November 21, 2016 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Susan Iverson, Acting City Administrator <br /> <br />FROM: Andy Brotzler, Interim Public Works Director <br /> <br />SUBJECT: Capital Improvement Program – 2017-2021 <br /> <br />Background <br /> <br />This memo outlines recommended revisions to the CIP. <br /> <br />Trails <br />The 2017 Capital Improvement Plan identifies Highway 96 and County Road F Sidewalk <br />Improvements. The proposed project will complete gaps in the existing trail system. In addition <br />to updating the costs of the two segments, Council also requested that staff provide the cost to <br />finish the trail along County Road E2 from New Brighton Road to Cleveland Avenue to the east. <br />See Attachment A for trail locations. <br /> <br />Trail Segment Total Project Cost 14-Str-002 (draft CIP) <br />Highway 96 $467,000 <br />County Road F $66,000 <br />County Road E2 $125,000 <br />TOTAL $658,000 $425,000 <br /> <br />The County Road E2 estimate assumes that the trail would be extended east of Cleveland <br />Avenue to match the existing urbanized trail that was recently constructed with the bridge project <br />at 35W, utilizing the existing shoulder along the south side of County Road E2. <br /> <br />The City recently awarded a preliminary design contract to Elfering Engineering for the <br />preliminary design of the Bethel Trail project, Project #18-Str-003. Elfering is waiting to receive <br />approval of the wetland delineation from Rice Creek Watershed District. Once the approval is <br />obtained, discussions with staff will take place in the next 1-2 weeks to discuss the trail <br />alignment and design. <br /> <br />The Parks, Recreation and Trails Committee have identified the County Road F trail as a <br />priority. <br /> <br /> <br /> MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.