My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-16-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
11-28-16-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 4:37:29 PM
Creation date
11/23/2016 4:31:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />Water Main <br /> <br />Public Works would like to add a trunk water main project to the CIP to be designed and <br />constructed with the Bethel Trail project. The water main is proposed on Snelling Avenue from <br />County Road E to Bethel Drive. This will complete a loop that is needed to provide continuous <br />service in the event of a break in the New Brighton Road system as well as provide water to the <br />TCAAP site. <br /> <br /> <br />Attachments <br />Attachment A: Trail Connection Maps – Highway 96, CR F, CR E2 <br />Attachment B: Johanna Marsh Tennis Court – Geotechnical Report, Wetland Delineation <br />Attachment C: Sanitary Sewer Maintenance Policy <br />Attachment D: Sample Playground Layout
The URL can be used to link to this page
Your browser does not support the video tag.