My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-31-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2016
>
10-31-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2016 9:56:46 AM
Creation date
12/30/2016 9:56:18 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL — OCTOBER 31, 2016 7 <br />5. Prior to the issuance of any development permits, a copy of all necessary supplemental <br />declarations between MedExpress and Arden Plaza, LLC addressing site operation issues, <br />including but not limited to driveway maintenance, shared parking, and drainage, shall be <br />provided to the City. <br />6. The Developer shall submit a financial surety in the amount of 125 percent of the <br />estimated costs of site improvements including grading, utilities, and paving, prior to the <br />issuance of any development permits. The financial surety shall be in the form of a letter <br />of credit issued by a FDIC -insured Minnesota bank, and be in a form acceptable to the <br />City. The purpose of the letter of credit is to ensure that site improvements are completed <br />in the event that the developer defaults on the Development Agreement. <br />7. The Developer shall submit a cash escrow in the amount of 25 percent of the estimated <br />costs of site improvements including grading, utilities, and paving, prior to the issuance of <br />any development permits. The escrow will be used for City costs related to review, <br />approval, and inspection of site improvements or any costs incurred by the City in the <br />event of a developer default. <br />8. The Developer shall submit a financial surety in the amount of 125 percent of the <br />estimated costs of landscaping prior to the issuance of any development permits. The <br />financial surety shall be in the form of a letter of credit issued by a FDIC -insured <br />Minnesota bank. The purpose of the letter of credit is to ensure that landscaping is <br />completed in the event that the developer defaults on the Development Agreement. The <br />City will hold the letter of credit for two years after the installation of landscaping. The <br />letter of credit should not expire during the two-year period. <br />9. The Developer shall submit a cash escrow in the amount of 25 percent of the estimated <br />costs of landscaping prior to the issuance of any development permits. The escrow will be <br />held by the City for two years after installation of landscaping and used for City costs <br />related to review, approval, and inspection of landscaping, or developer default. <br />10. Final construction plans shall be subject to approval by the Building Official and Fire <br />Marshall prior to the issuance of a Building Permit. <br />11. The Developer shall provide the City with a copy of the Rice Creek Watershed District <br />permit for the project prior to the issuance of any development permits. <br />12. A Grading and Erosion Control Permit will be required prior to the issuance of a Building <br />Permit. The Developer shall be required to demonstrate that the existing stormwater <br />system for Arden Plaza is adequate to accommodate the additional runoff that will result <br />from the development. <br />13. The Developer shall obtain a Right -of -Way Permit from Ramsey County for any <br />construction work required for the development within the County Road E right-of-way. <br />14. The building shall be permitted no more than a total of 150 square feet of wall signage. <br />15. All roof -mounted mechanical equipment shall be screened from ground -level view of <br />public streets. Wood screening shall not be permitted. <br />16. Trash service enclosure shall be fully enclosed and constructed with the same brick fiber <br />cement panel used for the principal structure. <br />17. All spandrel glass used on the building shall be light grey or other color that closely <br />matches the appearance of the transparent glass being used. <br />Councilmember Holden asked if the proposed building material was approved by the City. <br />Senior Planner Bachler discussed the B-2 design standards and required building materials. He <br />explained masonry brick was preferred but the applicant was proposing to use simulated brick. <br />
The URL can be used to link to this page
Your browser does not support the video tag.