Laserfiche WebLink
Page 2 of 2 <br /> <br />County Road E2 Trail Connection <br /> <br />An 8-ft wide bituminous trail is proposed along the south side of County Road E2 to connect the <br />existing bituminous trail that was recently constructed on the east side of Cleveland Avenue SW <br />and the existing bituminous trail at New Brighton Road. This bituminous trail will be <br />approximately 730-ft long (See Attachment B). <br /> <br />Currently there is not a crosswalk at the New Brighton Road trail crossing. A pedestrian crossing <br />and ramps are proposed to accommodate the trail entrance at this point. <br /> <br />County Road F Trail Connection <br /> <br />A 6-ft wide concrete walk is proposed along the south side of County Road F to connect the <br />existing concrete walk and crosswalk at Hamline Ave N and the existing concrete walk along <br />County Road F. This concrete walk will be approximately 400-ft long (See Attachment C). <br /> <br />There is currently a striped and signed crosswalk at the intersection of Hamline Avenue N and <br />County Road F. This crosswalk connects the trail on the east side of Hamline Avenue N to the <br />pedestrian ramps on County Road F. However, the pedestrian ramp on the south side of County <br />Road F does not currently connect to a trail. <br /> <br />The CIP identifies $575,000 for construction of the trail with funding sources to include Ramsey <br />County and State Aid funds. The proposed scope of work and fees for engineering services for <br />the trail improvements will be distributed at the work session. <br /> <br /> <br /> <br /> <br /> <br />ATTACHMENT A: Highway 96 Location Map <br />ATTACHMENT B: County Road E2 Location Map <br />ATTACHMENT C: County Road F W Location Map <br />ATTACHMENT D: City Park and Trails System <br /> <br />