My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-30-17-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
01-30-17-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 11:54:28 AM
Creation date
1/27/2017 11:12:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br />K:\03450-000\Admin\Docs\Civic Site\Cost Facility and Parking Memo 01262017.doc <br /> <br /> <br />Memorandum <br /> <br />To: Andy Brotzler <br /> <br />From: Jason Amberg <br /> Eric Zweber <br /> <br />Date: January 26, 2017 <br /> <br />Re: Arden Hills: TCAAP Civic Site: Community Center Cost Comparison; Facility and <br />Parking Assumptions <br /> WSB Project No. 03450-000 <br /> <br /> <br /> <br />COMMUNITY CENTER COST COMPARISON <br />Below is a summary of recent community center type projects developed in the Twin Cities area along <br />with a description of amenities and related costs for the purposes of comparison. <br /> <br />Example #1 – Low Level Renovation Cost (for reference only – not applicable to this project) <br />City of South St. Paul: Doug Woog Arena facility expansion <br /> 2 story building renovation and expansion <br /> Meeting rooms, office space, locker rooms, storage <br /> $1.2 million / 14,500 SF renovation and expansion = $82.75 per SF <br /> <br />Example #2 – Standard Level Development Cost <br />City of Rosemount: Steeple Center <br /> 2 story building expansion <br /> Lobby, kitchen, restrooms, meeting / conference rooms <br />$3 million / 10,000 SF expansion = $300 per SF <br /> <br />Example #3 – High Level Development Cost <br />City of Eden Prairie: Community Center Addition <br /> 2 story building expansion <br />Aquatics, meeting / conference rooms, fitness center, office space <br /> $21 million / 52,000 SF facility expansion = $403 per SF <br /> <br />BUILDING ASSUMPTIONS <br />The building assumptions below are based on the site, building and parking concept included in the <br />January 30, 2017 City Council Work Session packet. This concept illustrates a building with a footprint of <br />about 27,600 square feet and a parking lot with 65 stalls (4 handicapped stalls and 61 general parking <br />stalls). <br /> <br />City Hall <br />The current City Hall has 18,500 square feet and Arden Hills has an estimated population of 9,847 <br />residents in 2015. The 1,460 units anticipated within the TCAAP redevelopment would expect to increase <br />the City’s population by 3,500 residents to a total population of approximately 13,347, a 35.5% increase. <br />To accommodate this increased population, it is reasonable to expect that the City Hall would need to <br />expand in proportion with the population. A 35.5% increase in size of the current City Hall would result in <br />a building approximately 25,000 square feet in size. <br /> <br />A new City Hall would occupy almost all of the entire first floor of the building illustrated in the concept. A <br />second story would allow for additional areas for community functions. The second floor would not be
The URL can be used to link to this page
Your browser does not support the video tag.