Laserfiche WebLink
Page 2 of 2 <br /> <br />as the luminaire will be new and clean. The expected product life of the luminaires is <br />approximately 23 years. <br /> <br />Forest Lake Contracting has provided a product overview of the proposed LED shoebox light <br />and an estimated cost for removing and salvaging the existing lanterns and installing the new <br />LED lights. The proposed total cost is $6,999.00 <br /> <br />Staff has worked with Forest Lake Contracting in the past and found their work to be acceptable <br />and recommend accepting their proposal. <br /> <br />ATTACHMENT A: Photometrics – No lights on bridge <br />ATTACHMENT B: Photometrics – Lanterns <br />ATTACHMENT C: Photometrics – Shoebox <br />ATTACHMENT D: Forest Lake Contracting Proposal <br />