<br />Page 2 of 2 <br /> <br /> <br />Also proposed is the addition of a bituminous trail along the west side of Old Snelling Avenue <br />between Bethel Drive and County Road E2 (CR E2). A feasibility study was completed in 2008 <br />by Bolton & Menk for the Old Snelling Avenue Trail from SH 51 to CSAH 96. In the study, it <br />was recommended to locate the trail along the west side of Old Snelling Avenue. The segment <br />between Bethel Drive and CR E2 is identified as a 10’ wide urban trail (directly behind the curb) <br />with a retaining wall to minimize impacts which include driveways, steep slopes, landscaping <br />and wetlands. Due to the need for wetland delineations, potential wetland impacts and <br />mitigation requirements, and permitting, WSB has provided an alternate schedule in the event <br />the project is delayed due to the permitting timeline. The preliminary estimate for the trail, <br />including project costs is $700,000. <br /> <br />The 2017 CIP includes a project for CR E2 Water Main Replacement/Old Hwy 10 Water Loop. <br />The purpose of this project is to replace existing 12” water main on CR E2 from Old Snelling <br />Ave to Valentine Hills School as the main has experienced numerous breaks due to deterioration <br />of the pipe material. Due to the location of the existing water main on CR E2, the existing trail <br />will also need to be replaced. In addition, completion of a water main loop on Old Snelling <br />Avenue from CR E2 to CR E will provide redundancy in the system and no longer require <br />temporary feeds in the system or loss of service in the event of breaks in other areas. The <br />completion of the water main loop is also required to supply water to the TCAAP site. The CIP <br />identifies $400,000 for this project to be paid from the water fund. The current estimate is <br />approximately $500,000 if directional drilling is a viable construction method and $600,000 if <br />open cut construction with bituminous patching is necessary. Soil borings and a geotechnical <br />investigation are included in the scope of work. <br /> <br />The trail along County Road F west of Lexington Avenue is also identified in the CIP. Staff <br />recently met with Ramsey County to discuss trail projects. Ramsey County is currently planning <br />a 2018 project for improvements on County Road F to include widening, addition of turn lanes <br />and a traffic signal at Innovation Way. The County had planned to include the trail connection <br />with the roadway project. Ramsey County staff plans to present the project to the City Council <br />at a future meeting. <br /> <br />Discussion <br /> <br />Staff is recommending that the City Council approve the scope and fee for the 2017 Trail <br />Projects and the Old Snelling Water Main Improvements Project that is presented by WSB & <br />Associates. If accepted, WSB & Associates will begin the design for trail segments and the water <br />main. <br /> <br /> <br />Attachments: <br />Attachment A: Scope and Fee – WSB & Associates <br />