My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-17-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
02-21-17-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 2:42:13 PM
Creation date
2/17/2017 2:40:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 3 <br /> <br />DATE: February 21, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: 2017 Trail Project – Engineering Services <br /> <br /> <br />Requested Action <br /> <br />Discuss the scope and fee from WSB & Associates (Attachment A) in the amount of <br />$357,432.00 for design and construction services for the 2017 Trail Projects and the Old Snelling <br />Water Main Improvement Project (City Project No. 17-W-001). <br /> <br />Background <br /> <br />An 8-ft wide bituminous trail is proposed along the south side of County Road E2 to connect the <br />existing bituminous trail that was recently constructed on the east side of Cleveland Avenue SW <br />and the existing bituminous trial at New Brighton Road. Currently there is not a crosswalk at the <br />New Brighton Road trail crossing. A pedestrian crossing and ramps are proposed to <br />accommodate the trail entrance at this point. This bituminous trail will be approximately 655-ft <br />long. Initially staff considered extending the trail along the existing shoulder. After meeting <br />with Ramsey County staff, they have indicated that they would consider the following options: <br />1) allow the City to place bike trail symbol markings on the existing paved shoulder or 2) locate <br />an 8’ wide bituminous trail in the boulevard behind the existing curb. If the council chooses to <br />consider option 2, WSB would complete a topographic survey, prepare a preliminary alignment <br />and cost estimate for further consideration. <br /> <br />The Old Snelling Trail Improvements project proposes the addition of bituminous trails along <br />County Road E (CR E) and Old Snelling Avenue. Previous engineering studies determined <br />preliminary design for the trail on the south side of CR E between Freeway Park and Old <br />Snelling Avenue and for the trail on the west side of Old Snelling Ave between CR E and Bethel <br />Drive. A preliminary design for the trail segment was completed by Elfering Engineering with a <br />preliminary total cost estimate of $882,000. <br />AGENDA ITEM – 1C <br /> <br />MEMORANDUM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.