My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
04-10-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 4:33:19 PM
Creation date
4/10/2017 11:15:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 2 <br /> <br />DATE: April 10, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: 0.5 MG Water Tower Rehabilitation – Engineering Services <br /> <br /> <br />Budgeted Amount: Engineering Amount: Funding Sources: <br />$900,000 $46,274.00 Water Utility Fund <br /> <br />Requested Action <br />Approve the scope and fee from WSB & Associates in the amount of $46,274.00 for design, <br />bidding, and construction services for the 0.5 MG north water tower repair and repainting (City <br />Project No. 12-W-001). <br /> <br />Background <br />The 2017-2021 Capital Improvement Plan identifies a project to repair and repaint the City’s 0.5 <br />MG water tower located at Cummings Park (Attachment A). The tower last underwent repairs in <br />2001. In 2012 the tower was inspected by Kollmer Consultants at which time it was <br />recommended that repairs and repainting be completed within 1 to 2 years. A copy of the report <br />is available at City Hall. The south water tower was rehabilitated in 2013 at a cost of $783,250. <br />Based on recent bids and the scope of work for the tower, the current engineer’s estimate <br />(construction only) for the north tower work is $780,000. The work includes interior structural <br />repairs, interior coating replacement (including lead based paint removal), exterior structural <br />repairs and exterior coating. <br /> <br />Discussion <br />The scope, fee and schedule for design and bidding services are detailed in Attachment <br />B along with a project schedule. WSB proposes to complete the plans and bid documents for a <br />fee of $5,000. This does not include an additional inspection as staff feels the inspection reports <br />that the City has are adequate to prepare the bidding documents. Construction phase services are <br />proposed to be completed for an hourly not to exceed fee of $41,274.00, which includes half- <br />time construction observation, mileage reimbursement for the inspector and a 2-year warranty <br />inspection. <br />NEW BUSINESS - 9A <br /> <br />MEMORANDUM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.