Laserfiche WebLink
RIM=930.90 <br />INV=928.00 <br />EXISTING BUILDING <br />FFE = 937.5 <br />10" HD <br />P <br />E <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br />FF <br />E <br />= <br />9 <br />3 <br />6 <br />. <br />0 <br />B2 <br />- <br />1 <br />B2 <br />- <br />3 <br />B2 <br />- <br />4 <br />B2 <br />- <br />2 <br />B2 <br />- <br />5 <br />5 5 5 5 <br />5 <br />7 <br />7 <br />7 <br />7 <br />77 <br />7 <br />7 <br />8 <br />8 <br />5 <br />5 <br />5 5 <br />5 <br />5 <br />5 <br />7 <br />1 <br />2 <br />2 <br />2 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />6 <br />6 <br />9 <br />12 <br />10 <br />10 <br />11 <br />13 <br />2 <br />2 <br />13 <br />13 <br />13 <br />13 <br />13 <br />2 <br />2 2 <br />4 <br />6 <br />13 <br />13 <br />14 <br />14 <br />Description Rev.DateLEXINGTON STATION PHASE 2 RED FOX ROAD ARDEN HILLS, MINNESOTA 55112 1 03.17.17 RCWD Submittal Sheet:Sheet Title:Project #:Drawn By:Checked By:Issue Date:12176016 CBS MJW 03.06.173524 Labore Road White Bear Lake, MN 55110 651.481.9120 (f) 651.481.9201 www.larsonengr.com C 2017 Larson Engineering, Inc. All rights reserved. <br />P: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br /> <br />- <br /> <br />2 <br />0 <br />1 <br />7 <br />\ <br />1 <br />2 <br />1 <br />7 <br />6 <br />0 <br />1 <br />6 <br /> <br />- <br /> <br />L <br />e <br />x <br />i <br />n <br />g <br />t <br />o <br />n <br /> <br />S <br />t <br />a <br />t <br />i <br />o <br />n <br /> <br />- <br /> <br />P <br />h <br />a <br />s <br />e <br /> <br />2 <br />\ <br />C <br />. <br /> <br />D <br />e <br />s <br />i <br />g <br />n <br />\ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br /> <br />F <br />i <br />l <br />e <br />s <br />\ <br />1 <br />2 <br />1 <br />7 <br />6 <br />0 <br />1 <br />6 <br /> <br />- <br /> <br />C <br />1 <br /> <br />- <br /> <br />D <br />e <br />m <br />o <br />. <br />d <br />w <br />g <br />3524 Labore Road White Bear Lake, MN 55110 651.481.9120 (f) 651.481.9201 www.larsonengr.com Project Title:ROBERTS MANAGEMENTGROUP1851 BUERKLE ROAD WHITE BEAR LAKE, MN 55110 Client:Matt Woodruff, P.E.Date: Reg. No.:03.06.17 41885I hereby certify that this plan,specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota.2 Final PUD Submittal 3 City Comments03.27.17 04.12.17PHASE 2 FINAL PUD SUBMITTAL 0NORTH 15 30 60REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SECTIONSYMBOL LEGEND REMOVE AND DISPOSE OF EXISTING BUILDING AND ALL APPURTENANCES IN ACCORDANCE WITH LOCAL CODES REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT REMOVE AND DISPOSE OF CONCRETE PAVEMENT REMOVE EXISTING PAVEMENT STRIPING BY MEANS OF GRINDING OR SODA BLASTING REMOVE AND DISPOSE OF EXISTING TREE REMOVE AND SALVAGE SIGN AND POST REMOVE, SALVAGE, OR RELOCATE EXISTING DECORATIVE LIGHT AND DISPOSE OF EXISTING CONCRETE FOOTING. SEE ELECTRICAL PLAN.REMOVE AND DISPOSE OF EXISTING LIGHT, POLE, AND CONCRETE FOOTING REMOVE AND DISPOSE OF EXISTING MONUMENT SIGN REMOVE EXISTING OVERHEAD UTILITY. COORDINATE WITH UTILITY OWNER.REMOVE AND DISPOSE OF EXISTING CONCRETE BLOCK TRASH ENCLOSURE REMOVE AND SALVAGE EXISTING "DRIVE-THRU" SIGN REMOVE AND DISPOSE OF EXISTING CONCRETE CURB REMOVE AND DISPOSE OF EXISTING STORMWATER PIPE AND PLASTIC DRAIN1 DEMOLITION PLAN C1KEY NOTES DEMOLITION NOTES 1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate all necessary utility demolitions and relocations from existing utility locations to all onsite amenities and buildings. These connections include, but are not limited to, water, sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locate utilities throughout the area under construction. The Contractor shall retain the services of a private utility locator to locate the private utilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and local standard specifications for construction.2 3 4 5 6 7 8 9 10 11 12 13 14