My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
04-24-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 11:52:58 AM
Creation date
4/21/2017 12:11:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – APRIL 5, 2017 6 <br /> <br /> <br />Mr. Roberts commented he supported this recommendation from staff. <br /> <br />Chair Thompson requested further information on how delivery trucks would flow through the <br />site. <br /> <br />Mr. Roberts described how delivery trucks would flow through Phase 1 and Phase 2 of the <br />property. <br /> <br />Commissioner Lambeth asked for additional comment from the applicant on the monument <br />sign. <br /> <br />Mr. Roberts explained he was trying to keep the monument signs for Phase 1 and Phase 2 <br />similar in size. He noted the Phase 1 monument sign has seven tenant panels at this time. <br /> <br />Commissioner Jones understood the Phase 1 sign was 20 feet in height. He stated he supported <br />the 26-foot-high monument sign for Phase 2 given the proposed location. <br /> <br />Chair Thompson questioned if the monument sign location could be relocated. <br /> <br />Mr. Roberts stated this could be considered, but stated he was trying to put the monument sign <br />relatively close to the new businesses. <br /> <br />Chair Thompson inquired if any of the tenants within Phase 2 would require outdoor seating. <br /> <br />Mr. Roberts explained he had provided space for outdoor seating on the east and north side of <br />the building. He indicated he did not have a specific tenant in mind, but noted he would be <br />working to find a user that was interested in utilizing this outdoor space. <br /> <br />Commissioner Lambeth questioned when this project would begin construction. <br /> <br />Mr. Roberts commented he would begin construction on the Phase 2 building in the spring of <br />2018. <br /> <br />Commissioner Neururer discussed Condition #12 and asked if staff was recommending a 16- <br />foot monument sign. <br /> <br />Senior Planner Bachler stated this was correct, staff was recommending the monument sign on <br />Red Fox Road be a maximum of 16 feet in height. <br /> <br />Mr. Roberts requested the Commission allow him a small amount of flexibility with regard to <br />the monument sign. <br /> <br />Chair Thompson opened the public hearing at 7:42 p.m. <br /> <br />Chair Thompson invited anyone for or against the application to come forward and make <br />comment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.