Laserfiche WebLink
Attachment E <br /> -- iVEN HILLS <br /> Approved: <br /> CITY OF ARDEN HILLS,MINNESOTA <br /> PLANNING COMMISSION <br /> WEDNESDAY,MAY 3,2017 <br /> 6:30 P.M. -ARDEN HILLS CITY HALL <br /> PLANNING CASES <br /> A. Planning Case 17-012; 4255-4295 Lexington Avenue North — CSM Corporation — <br /> Master and Final Planned Unit Development—Public Hearing <br /> Hannah Rybak, WSB, stated CSM Corporation owns the Arden Hills Corporate Center located <br /> off of Lexington Avenue just north of the Boston Scientific corporate campus. The 16.6-acre site <br /> is comprised of four lots that were created through two separate subdivisions granted by the City <br /> in 1995 and 1999. There are a total of four existing buildings on the site, with the buildings at <br /> 4293 and 4295 Lexington Avenue sharing a common wall. The development today functions as a <br /> single entity with the four lots sharing common access driveways, utilities, stormwater <br /> management, and parking. <br /> Ms. Rybak reported the Arden Hills Corporate Center was previously part of the Control Data <br /> site, which included the subject four lots and a portion of what is now the Boston Scientific <br /> campus located to the south of Cummings Park Drive. A PUD was previously approved in 1996 <br /> for Control Data and included a portion of the existing Arden Hills Corporate Center. This PUD <br /> is no longer in effect and the site currently does not operate under any special agreements with <br /> the City. <br /> Ms. Rybak commented in 2015, the City approved a Site Plan Review and Variance in Planning <br /> Case 15-003 permitting CSM to construct 22 parking stalls at 4293 Lexington Avenue. The <br /> additional parking stalls were never constructed and the approval has since expired. A Variance <br /> was needed in this case to allow the parking area to encroach within the five-foot setback from <br /> the side property line. Staff has recommended that CSM apply for the proposed parking <br /> expansion through the PUD process given that the properties currently function as a planned unit <br /> development and in order to clean up the past planning case history for the site. <br /> Ms. Rybak explained CSM has requested a Master PUD that would cover the four lots within <br /> the existing Arden Hills Corporate Center and a Final PUD for the construction of additional <br /> parking stalls to meet the needs of their existing tenants. The proposed parking expansion would <br /> include new stalls located in several areas throughout the properties. Parking would be accessible <br /> to all tenants within the development: <br /> • 14 stalls along the western side of Parcel 1 <br /> • 8 stalls in the northwestern corner of Parcel 2 <br />