My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
05-22-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:23:03 AM
Creation date
5/18/2017 2:51:34 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW BUSINESS—8E <br /> ,- i DEN HILLS <br /> MEMORANDUM <br /> DATE: May 22, 2017 <br /> TO: Honorable Mayor and City Councilmembers <br /> William S. Joynes, Sr., City Administrator <br /> FROM: Sue Polka, Public Works Director/City Engineer <br /> SUBJECT: Lift Station No. 3 —Pump and Piping Replacement <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> $60,000 $34,752.00 2017 Sewer Budget <br /> Requested Action <br /> Approve quotes from Electric Pump to replace two pumps and associated piping at Lift Station <br /> No. 3 in the amount of$34,752 (Attachment A). <br /> Discussion <br /> Lift station No. 3 is currently in need of a new mixer. While the cost to replace just the mixer is <br /> $9,000, the existing pumps are approximately 20 years old and a brand that does not operate with <br /> the City's standardized equipment that is being installed as lift stations are upgraded. Staff is <br /> recommending that the pumps be replaced with new Flygt pumps, 1 flush valve and associated <br /> piping. The total cost for equipment and installation is $34,752.00. Funding is available in the <br /> 2017 sewer budget. <br /> Attachments: <br /> Attachment A: Quote from Electric Pump <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.