My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
05-22-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:23:03 AM
Creation date
5/18/2017 2:51:34 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page: 1 <br /> QUOTATION <br /> 201 4th Ave SW E 0173902 P New Prague,MN 56071 USA QUOTE NUMBER <br /> QUOTE DATE: 5/10/2017 <br /> Telephone: (952)758-6600/FAX(952)758-7778 EXPIRE DATE: 6/12/2017 <br /> ELECTRIC PUMP Toll Free 1-800-536-5394 <br /> SALESPERSON: PETE REARDON <br /> www.electricpump.com CUSTOMER NO: 7550211 <br /> QUOTED BY: MKH <br /> LS#3 PIPING <br /> QUOTED TO: JOB LOCATION: <br /> CITY OF ARDEN HILLS CITY OF ARDEN HILLS <br /> 1245 WEST HIGHWAY 96 1245 WEST HIGHWAY 96 <br /> SAINT PAUL,MN 55112 SAINT PAUL,MN 55112 <br /> CONFIRM TO: <br /> JEFF FRID 651-792-7852 <br /> CUSTOMER P O SHIP VIA F.O.B_ TERMS <br /> EP TRUCK NET 30 DAYS <br /> ITEM NUMBER QUANTITY UNIT AMOUNT <br /> RE:PIPING REPLACEMENT AT LS#3 11,763.00 <br /> ELECTRIC PUMP PROPOSES: <br /> 0000005401305 CONNECTION,DISCH 4X4"CI 2.00 EACH <br /> 2"X4"INTERMEDI SS INTERMEDIATE BRACKETS COMPATIBLE WITH 2.00 EACH <br /> FLYGT <br /> 2"UPPER GUIDE 2"UPPER GUIDE DOUBLE RAIL FOR FLYGT 2.00 EACH <br /> SPS40T4L2 2"SS 304 SCH 40 GUIDE PIPE/20'LENGTH MINIMUM 160.00 FEET <br /> *PIPING LOT OF DUCTILE IRON PIPE AND FITTINGS 1.00 EACH <br /> *MISC LOT OF MISC ANCHOR BOLTS,NUTS,BOLTS, 1.00 EACH <br /> GASKETS AND INSTALL MATERIALS <br /> *INSTALL FIELD LABOR FOR ELECTRIC PUMP SERVICE TECHS 1.00 EACH <br /> TO REMOVE EXISTING PUMP BASES,DISCHARGE <br /> PIPE,GUIDE RAILS AND BRACKETS,AND INSTALL <br /> ALL NEW COMPONENTS. <br /> /FR FREIGHT INCLUDED 1.00 EACH <br /> TOTAL FOR MATERIALS WITH INSTALL: $11,763.00 <br /> PLEASE NOTE THAT THE CITY OF ARDEN HILLS SHALL PROVIDE BYPASS OF SEWAGE WHILE WORK IS PERFORMED. <br /> PLEASE CONTACT US WITH ANY QUESTIONS OR TO PROCEED WITH AN ORDER. <br /> SINCERELY--MYRA HOFFMAN 952-758-6600 CC:PETE REARDON 952-220-1611 <br />
The URL can be used to link to this page
Your browser does not support the video tag.