My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-03-16 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2016
>
02-03-16 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 3:53:40 PM
Creation date
6/6/2017 3:53:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – February 3, 2016 3 <br /> <br />Senior Planner Bachler reviewed the surrounding area and the Site Plan Review. <br /> <br />Senior Planner Bachler provided the Findings of Fact for review: <br /> <br />1. Boston Scientific has requested approval for a Site Plan Review to construct a skyway <br />connection between Buildings 3 and 10 and to complete minor modifications to the <br />parking lot on the north side of Building 10 at 4100 Hamline Avenue North. <br />2. Boston Scientific has requested an extension for the March 1, 2016 deadline for the <br />submittal of a Site Plan Review for the modification of the parking area along the Lot 1 <br />and Lot 2 property line and the submittal of a building permit for the removal of the <br />existing skyway between Buildings B and E, as required by the conditions of approval in <br />Planning Case 15-001. <br />3. The Boston Scientific Campus is a conforming use in the I-1 Limited Industrial Zoning <br />District and operates under an approved PUD. <br />4. New building construction or site modifications identified on the approved Campus <br />Master Plan require the submittal of a Site Plan Review application prior to construction. <br />5. The location of the proposed skyway and the proposed modifications to the parking lot <br />north of Building 10 are generally consistent with the approved Campus Master Plan. <br />6. A 4,147 gross square foot addition to Building 10 would be required to tie the skyway <br />into the established internal circulation of the building. <br />7. The proposal is in conformance with underlying I-1 Zoning District requirements and the <br />approved PUD. <br />8. The proposed modifications to the Building 10 parking lot include the removal of 26 <br />parking stalls. <br />9. Boston Scientific has accounted for these removed stalls with an additional 26 “proof of <br />parking” spaces in the Campus Parking Plan. <br />10. The proposal is not expected to adversely affect the surrounding neighborhood or the <br />community as a whole. <br /> <br />Senior Planner Bachler stated that based on the submitted plans and findings of fact, staff <br />recommends approval of Planning Case 16-004 for a Site Plan Review to construct a skyway <br />between Buildings 3 and 10 and complete minor modifications to the parking lot on the north <br />side of Building 10 at 4100 Hamline Avenue North. If the Planning Commission recommends <br />approval of this request, staff recommends that the following twelve (12) conditions be included <br />with the approval: <br /> <br />1. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City <br />Council. <br />2. The applicant shall continue to abide by all previous Development Agreements, Master <br />PUD approvals, and subsequent PUD Amendment approvals. <br />3. All necessary City permits for the construction of the skyway and modifications to the <br />parking lot on the north side of Building 10 shall be obtained by September 1, 2017, or an <br />extension request shall be submitted in writing to the City at least forty-five (45) days <br />prior to the expiration date. <br />4. Final construction plans shall be subject to approval by the City Building Official, City <br />Engineer, and Fire Marshall prior to the issuance of a Building Permit.
The URL can be used to link to this page
Your browser does not support the video tag.