My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-16PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2016
>
06-08-16PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 3:58:14 PM
Creation date
6/6/2017 3:57:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 8, 2016 12 <br /> <br />site after consolidation in late 2018. It was noted Planning Case 16-014 includes two separate <br />components: <br /> <br />1. Master Planned Unit Development Amendment <br />2. Final Planned Unit Development Phase 1 <br /> <br />City Planner Streff stated that the Master PUD Amendment request would update the campus <br />master plan. Land O’Lakes will be completing the new office building and site improvements <br />over two phases. Phase I includes the expansion and reconfiguration of the visitor parking lot on <br />the south side of the existing buildings. This phase is expected to be completed by late summer <br />2016. Phase II would comprise the remaining components of the expansion project, including the <br />new office building and the expansion of the employee surface parking lot on the north side of <br />the buildings. Construction on Phase II is expected to be complete by December 31, 2018. At this <br />time, Land O’Lakes is requesting City approvals for the overall Master PUD and the Final PUD <br />for Phase I of the project. The company expects to submit a Final PUD application for Phase II in <br />June 2016. <br /> <br />City Planner Streff commented that the Planned Unit Development process is a tool that <br />provides additional flexibility for development that an underlying zoning district would not <br />otherwise allow. For example, a PUD may make exceptions to setbacks, lot coverage, parking <br />requirements, signage, building materials, or landscaping requirements. It is intended to <br />overcome the limitations of zoning regulations and improve the overall design of a project. <br />While the PUD process allows the City to negotiate certain aspects of the development, any <br />conditions imposed on the PUD must have a rational basis related to the expected impact of the <br />development. A PUD cannot be used to permit uses that would not otherwise be permitted in the <br />underlying zoning district. <br /> <br />City Planner Streff indicated that the first step in the PUD process is the Master PUD, which is <br />a detailed concept plan for the entire development proposal, often outlining individual phases for <br />development over a specified period of time. The second step is the Final PUD for each phase, <br />which is a more detailed review as each development phase moves forward. During the Master <br />PUD stage, the City works with the applicant to set an overall design framework or standard for a <br />proposed development. These standards are then written into a development agreement which <br />generally includes the design standards, a list of conditions, the size of the development, and <br />what, if any, deviations from the underlying zoning district will be permitted. Once the Master <br />PUD is approved, the applicant then creates a development that conforms to the development <br />agreement for each subsequent Final PUD phase. The level of detail is guided by the type and <br />scale of the development as well as the guidance or flexibility within the Zoning Code. <br /> <br />Site Data <br />Land Use Plan: I/O Light Industrial and Office <br />Existing Land Use: OFC – Office <br />Zoning: I-1 – Limited Industrial District <br />Current Lot Sizes: 47.37 Acres (2,063,577.7 square feet) <br />Topography: Fairly Flat <br /> <br />City Planner Streff reviewed the surrounding area and the Plan Evaluation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.