My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
01-06-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 4:43:10 PM
Creation date
6/6/2017 4:42:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FDH Velocitel, Inc.|952.944.1858 | www.fdhvelocitel.com <br />1701 American Blvd E <br />Suite 16 <br />Bloomington, MN 55425 <br />Project Narrative <br />November 11, 2015 <br />Attn: Matthew Bachler <br />Associate Planner <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />RE: FA No.10116081/Site No.MNL01417 Site Name:Shoreview / Project: LTE 2C-3C <br />Dear Mr.Bachler and to whom this concerns, <br />This letter is to inform you that New Cingular Wireless PCS, LLC (d.b.a., AT&T Mobility) is in the <br />process of making enhancements to its wireless communications facility at 3900 Bethel Drive Arden <br />Hills,Minnesota 55112.As requested by the City of Arden Hills a summary of the proposed build is <br />necessary to obtain zoning and permitting approval by the City. <br />AT&T is proposing to remove the existing antenna that are located under a stealth (12’) twelve foot <br />fiberglass canister,as represented in the Rev B Construction Drawings dated 11-05-15 and the Photo <br />Sims dated 11-05-15. New Cingular Wireless PCS LLC will be installing (9) SBNHH-1D65A antenna to <br />replace the existing Kathrein 80010764, as to obtain the necessary capacity and coverage that is <br />demanded by the consumer. The proposed associated equipment will be mounted inside the cupola and <br />inside the shelter as represented in the Structural dated 11-04-15. <br />In order to mount the (9) SBNHH-1D65A antenna the mast pipe will need to be extended (2’) two feet as <br />to allow for proper positioning to reduce interference, accurate clearance and suitable cable connection. <br />The SBNHH-1D65A is 55.6”or 4’ 7 ½”antenna,which will be positioned in a stacked configuration, as <br />represented in the construction drawings provided. There is a (1’) one foot separation needed between the <br />cupola, as well between stacked antennas to reduce interference. The (1’) one foot separation will allow <br />for the bending of the cable distribution to obtain proper cable port connections from the antenna to the <br />associated equipment within the cupola. Due to the separation, the antenna positioning/placement within <br />(lower antenna centerline (CL)is 52’ and the upper antenna centerline is 59’) the stealth smoke stake the <br />canisters will need to be extended (2’) two feet to meet the necessary distance needed to stack the antenna <br />and allow for complete functionality of the system, rather than adding additional canisters or expanding <br />the site further. <br />In conclusion the mast pipe and the canisters will need to be extended by 2’as to allow for the complete <br />functionality of the cell site to obtain the coverage demands by the market and their consumers.We very <br />much appreciate your assistance in the continuing operation of this wireless communication facility. <br />Thank you for your attention to this matter and if you require further information or if you have any <br />questions, please feel free to contact me at 952.944.1858 x 188 or at Mark.Hennek@FDHVelocitel.com <br />Sincerely, <br />Mark Hennek <br />Velocitel, Inc. on behalf of AT&T <br />1701 American Blvd East <br />Bloomington, MN 55425
The URL can be used to link to this page
Your browser does not support the video tag.