Laserfiche WebLink
01-19-16 boston scientific.doc <br />Page 1 of 1 <br /> <br />MEMORANDUM <br /> <br />DATE: January 19, 2016 <br /> <br />TO: Matthew Bachler, Senior Planner <br /> <br />FROM: John M. Anderson, Acting Public Works Director <br /> <br />SUBJECT: Boston Scientific - Site Plan Review PC 16-004 <br /> <br /> <br /> <br />I have reviewed the plans for the Planning Case 16-004 dated January 4, 2016. The <br />following are my comments: <br /> <br />1. The sanitary manhole under the skyway on the west side of Innovation way will <br />require 16 feet clear overhead for maintenance. <br />2. The plantings in the bio-filtration area will be shaded by the skyway and will need to <br />be tolerant of the shady conditions. <br />3. Any retaining wall over 4 feet in height requires a building permit including <br />structural design and fencing along the top. <br />4. The retaining wall north of the Skyway and east of the walk way is proposed to be <br />constructed on top of the existing sanitary sewer. Structural analysis should be <br />provided to show there are no issues with building on top of this sewer. <br />5. A grading and erosion control permit issued by the City of Arden Hills will be <br />required for this work. The applicant is responsible for determining other permits <br />needed such as Rice Creek Watershed District and MPCA – NPDES construction <br />permit. The applicant will provide confirmation to the city if these permits are <br />required and if so provide copies of the issued permits to the City.