My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
06-08-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 5:08:39 PM
Creation date
6/6/2017 4:55:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – April 6, 2016 9 <br /> <br />14.6 percent where the zoning regulations require a minimum of 20 percent coverage. Secondly, <br />the proposed County Road E monument sign would exceed the maximum height and sign copy <br />area permitted in Sign District 4. <br /> <br />Site Data <br />Land Use Plan: Community Mixed Use <br />Existing Land Use: Commercial <br />Zoning: B-2: General Business District <br />Current Lot Sizes: 48,000 square feet <br />Topography: Relative flat <br /> <br />Senior Planner Bachler reviewed the surrounding area and the Plan Evaluation. <br /> <br />Senior Planner Bachler provided the Findings of Fact for review: <br /> <br />1. The property at 1160 County Road E West is located in the B-2 - General Business <br />Zoning District and in Sign District 4. <br />2. Section 1320.085 of the Zoning Code states that Site Plans approved for properties in the <br />B-2 District before November 24, 2008 will remain in effect, but that the PUD process <br />will be used for any future site amendments. <br />3. Arden Square, LLC has requested a Master and Final PUD at 1160 County Road E West <br />to amend the Site Plan approved for the property in Planning Case 92-016. <br />4. The proposed Master and Final PUD includes expanding and rearranging the property’s <br />drive lanes and parking spaces, and installing a new monument sign, trash enclosure, <br />bicycle racks, and stormwater management system on the property. <br />5. The City has adopted the Guiding Plan for the B-2 District that outlines future <br />development principals for the area. <br />6. The City has adopted Design Standards for the B-2 District within the Zoning Code. <br />7. The proposed Master and Final PUD is in substantial conformance with the requirements <br />of the City’s Zoning Code. The applicant has requested flexibility for landscape lot <br />coverage of 14.6 percent where the zoning regulations require a minimum of 20 percent <br />coverage. <br />8. The proposed Master and Final PUD is in conformance with the Guiding Plan for the B-2 <br />District. <br />9. The proposed Master and Final PUD is in substantial conformance with the requirements <br />of the City’s Sign Code. The applicant has requested flexibility to install a monument <br />sign that exceeds the height, sign copy area, and total sign area requirements for Sign <br />District 4. <br />10. The proposed Master and Final PUD is in conformance with the City’s Comprehensive <br />Plan. <br />11. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a developer. Where the plan is not in conformance with the City’s Zoning or <br />Sign Code, flexibility has been requested by the applicant and/or conditions have been <br />placed on an approval that would mitigate the nonconformity. <br />12. The proposed Master and Final PUD is not anticipated to create a negative impact on the <br />immediate area or the community as a whole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.