My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
07-06-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 9:56:04 AM
Creation date
6/7/2017 10:47:26 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 8, 2016 16 <br /> <br />Commissioner Zimmerman asked if the view of Land O’Lakes from I-694 would be altered. <br /> <br />Mr. Slack discussed how the property would be impacted by the proposed campus renovations <br />and noted the site would be heavily landscaped in order to keep the site hidden from the freeway. <br /> <br />Commissioner Lambeth questioned when the groundbreaking would occur for the new <br />building. <br /> <br />Mr. Slack noted that Land O’Lakes planned to break ground on the new building mid-October to <br />early November of 2016. The parking and restriping plan for the parking lots was reviewed. <br /> <br />Commission Lambeth expressed concern with the number of parking spaces that would be lost <br />during construction for staging purposes. <br /> <br />Ms. Droege stated Lake O’Lakes was leasing space in Shoreview for additional parking. It was <br />noted a shuttle would be used to get employees from Shoreview to the Arden Hills campus. <br /> <br />Commissioner Jones questioned if the two buildings would be connected by underground <br />tunnels or a skyway. <br /> <br />Mr. Slack reported the two buildings would have connections on Level 1 and Level 2. <br /> <br />Chair Thompson appreciated the detailed plans that were provided by Land O’Lakes. She <br />requested further information on the storm water management plan for this site. <br /> <br />Mr. Slack described the storm water management plan in detail with the Commission. He noted <br />this project would be LEED certified and therefore the project would have very high storm water <br />standards. <br /> <br />Commissioner Zimmerman asked how snow would be managed on the Land O’Lakes campus. <br /> <br />Mr. Slack explained many conversations have occurred regarding snow removal and there may <br />be a need to remove snow from the site. There was a potential that environmentally friendly <br />deicing materials may be used on site. He indicated regional stormwater would be managed on <br />this site and he wanted to be conscience of the chemicals used on site. <br /> <br />Chair Thompson opened the public hearing at 8:21 p.m. <br /> <br />Chair Thompson invited anyone for or against the application to come forward and make <br />comment. <br /> <br />There being no comment Chair Thompson closed the public hearing at 8:22 p.m. <br /> <br />Commissioner Zimmerman moved and Commissioner Hames seconded a motion to <br />recommend approval of Planning Case 16-014 for a Master Planned Unit Development <br />(PUD) Amendment & Final PUD for Phase 1 at 4001 Lexington Avenue North, based on <br />the findings of fact, submitted plans, and the sixteen (16) conditions in the June 8, 2016, <br />Report to the Planning Commission.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).