Laserfiche WebLink
**No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 <br />of the project suggests a new 4 story office structure with a footprint of 50,444 square feet. <br />***The lot is 47.37 acres or 2,063,577.7 square feet. <br /> <br />4. The project will meet or exceed tree requirements related to building height (4 stories) <br />a. 34% (263/780) trees 3.5” to 4” cal. Inches <br />b. 32% (249/780) trees 4.5” to 6” cal. Inches <br /> <br />5. The project will meet or exceed tree requirements related to tree replacement requirements. <br /> <br />FINAL PUD SUBMITTAL Cal. Inches Number of Trees <br />PHASE 1 <br />Proposed Removal 782 75 <br />Trees Preserved (Total minus Phase 1) 30854 2473 <br /> <br />PHASE 2 <br />Proposed Removal 7800 654 <br />Trees Preserved (Total minus Phase 1 and 2) 23054 1819 <br /> <br />ENTIRE SITE <br />Existing Significant Trees 31636 2548 <br />10% Permitted Removal 3164 255 <br />Proposed Removal 8582 729 <br />Total Trees Preserved 19890 1564 <br />Replacement Trees Required 2709 TBD <br />Replacement Trees Proposed 2728 780 <br /> <br /> <br /> <br />6. Environmental Conservation and Sustainability <br />a. Per Ordinance 1325.05 Subsection 8 – Additional Design Standards for New <br />Development in B2/B3 districts, the City encourages the use of green materials and <br />environmentally friendly construction and site design such as the use of pervious <br />surfaces, green rooftops, energy efficient materials, LEED standards, and other green <br />building techniques. The new corporate building and site will be designed with <br />sustainable best practices and will seek a minimum of LEED-NC 2009 Gold certification <br />even in an I-1 Limited Industrial District. The site will be developed to fulfill multiple <br />Sustainable Site LEED credits such as Stormwater Design Quality and Quantity, Light <br />Pollution Reduction as well as Water Efficient Landscaping. Transportation amenities <br />such as interior and exterior bicycle parking and preferred parking for carpool and <br />electric vehicles including charging stations will be incorporated into the parking design. <br />Along with meeting LEED standards for internal water efficiency and the use of energy <br />efficient lighting and mechanical systems, the new corporate building will strive to use <br />local materials that are healthy to the building occupants. <br /> <br />7. Additional Design Compliance