Laserfiche WebLink
R/W R/W R/W R/W <br />R/W R/W <br />STM STM <br />ST <br />M <br />ST <br />M <br />STM STM <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />S <br />T <br />M <br />SAN <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />SA <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />S <br />A <br />N <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />6' <br />' <br />W <br />W W W <br />W W W <br />W <br />G <br />G <br />G G <br />W W W W <br />STORM MH <br />RIM=937.26 <br />INV SE (24" RCP)=931.94 <br />INV W (21" RCP)=932.81 <br />INV NW (12" RCP)=932.91 <br />STORM MH <br />RIM=940.6 <br />INV NW/S (12" HDPE)=934.4 <br />CB BEEHIVE <br />RIM=937.69 <br />INV SE (12" HDPE)=934.63 <br />STORM MH <br />RIM=937.85 <br />INV N (12" HDPE)=932.90 <br />INV S (12" HDPE)=932.85 <br />INV N (18" RCP)=932.85 <br />STORM MH <br />RIM=940.6 <br />INV NW/S (12" RCP)=934.4 <br />FES 12 <br />INV=936.2 <br />Easement for Highway purposes <br />per Doc. No. 609136 (14) <br />Trail easement agreement <br />per Doc. No. 2156885 (16) <br />Drainage and Utility easment <br />per Doc. No. 2156883 (13) <br />Approximate Bio-Filtration <br />area per Doc. No. 2163656 (18) <br />Existing Building <br />COUNTY ROAD E <br />Publicly dedicated right of way <br />Bituminous surface <br />P <br />r <br />i <br />v <br />a <br />t <br />e <br /> <br />a <br />c <br />c <br />e <br />s <br />s <br /> <br />d <br />r <br />i <br />v <br />e <br />w <br />a <br />y <br />B <br />i <br />t <br />u <br />m <br />i <br />n <br />o <br />u <br />s <br /> <br />s <br />u <br />r <br />f <br />a <br />c <br />e <br />C <br />o <br />n <br />c <br />r <br />e <br />t <br />e <br /> <br /> <br />s <br />i <br />d <br />e <br />w <br />a <br />l <br />k <br />Concrete sidewalk <br />Edge of water <br />on 7/18/16 <br />Pond <br />B <br />i <br />t <br />u <br />m <br />i <br />n <br />o <br />u <br />s <br /> <br />s <br />u <br />r <br />f <br />a <br />c <br />e <br />Bituminous surface <br />UGE <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />UGE UGE UGE UGE UGE UGE <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />UG <br />E <br />UG <br />E <br />UG <br />E <br />UG <br />E <br />UG <br />E <br />UG <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />E <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />U <br />G <br />T <br />W <br />6" <br />S <br />A <br />N <br />U <br />G <br />T <br />MEDEXPRESS <br />1150 COUNTY RD E <br />(4,733 SF) <br />CO <br />DS <br />M <br />CO <br />DS <br />DS <br />G <br />G <br />G <br />G <br />G <br />G <br />GW <br />W <br />DS <br />DS <br />DS <br />DS <br />CO <br />8" <br />S <br />T <br />M <br />4"STM <br />CO <br />4" <br />ST <br />M <br />4"STM <br />12"STM <br />1 <br />2 <br />" <br />S <br />T <br />M <br />5 <br />5 <br />3 <br />4 <br />4 <br />2 <br />2 <br />2 <br />(R) <br />55 <br />' <br /> <br />@ <br /> <br />1 <br />. <br />0 <br />4 <br />% <br /> <br />( <br />M <br />I <br />N <br />. <br />) <br />2 <br />(R) <br />CONTRACTOR TO VERIFY <br />EXISTING UTILITY <br />0 <br />GRAPHIC SCALE (IN FEET) <br />20 20 40 <br />PROPOSED <br />CONCRETE CURB <br />PAVEMENT/WALK <br />BUILDING <br />STORM SEWERSTM <br />SANITARY SEWERSAN <br />COMBINED WATER <br />SERVICE LINEW <br />GAS SERVICE LINEG <br />UGND. ELECTRIC LINEUGE <br />UGND. TELEPHONE LINEUGT <br />CLEANOUT <br />CATCH BASIN <br />LIGHT POLE <br />SEE SHEET C5.0 FOR STORM <br />STRUCTURE SCHEDULE <br />SEE SHEET C6.1 <br />FOR GENERAL UTILITY DETAILS <br />SEE ARCHITECTURAL PLANS <br />FOR STUB LOCATIONS <br />UTILITY SERVICE NOTES: <br />A. SANITARY SEWER: <br />THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF THE EXISTING UTILITIES PRIOR TO ORDERING ANY SANITARY SEWER CONSTRUCTION MATERIALS. <br />CONTACT THE DESIGN ENGINEER WITH ANY DISCREPANCIES. THE CONTRACTOR SHALL TRENCH, BACKFILL, PROVIDE AND INSTALL A NEW 6'’ SCHEDULE 40 <br />PVC SERVICE LATERAL AND ASSOCIATED CLEANOUTS FROM THE PROPOSED BUILDING TO THE EXISTING SANITARY SEWER MAIN. ALL WORK SHALL BE IN <br />ACCORDANCE WITH CITY OF ARDEN HILLS SEWER CODE AND THE STATE OF MINNESOTA BUILDING AND PLUMBING CODES. <br />B. WATER SERVICE: <br />THE CONTRACTOR SHALL TRENCH, BACKFILL, PROVIDE AND INSTALL A NEW 1.5” TYPE “K” COPPER WATER SERVICE LINE AS SHOWN ON THE PLAN. THE <br />CONTRACTOR SHALL LOCATE THE EXISTING LINE, TIE INTO THE EXISTING SERVICE LINE, INSTALL THE NEW WATER SERVICE LINE AND MAKE THE <br />CONNECTION TO THE METER INSIDE THE BUILDING. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES AND WATER METERS AS DIRECTED BY <br />THE CITY OF ARDEN HILLS PUBLIC WORKS DEPARTMENT. ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF ARDEN HILLS AND STATE OF <br />MINNESOTA BUILDING AND PLUMBING CODES. <br />C. ELECTRIC SERVICE: <br />THE CONTRACTOR SHALL TRENCH, BACKFILL, PROVIDE AND INSTALL 2-3” SCH 40 PVC CONDUITS WITH LONG SWEEPING BENDS AND PULL WIRE FROM THE <br />EXISTING UNDER GROUND ELECTRIC LINES TO THE PROPOSED UTILITY TRANSFORMER, OFF THE NORTHWEST CORNER OF THE BUILDING, BACK TO THE <br />ELECTRIC/DATA ROOM. MAINTAIN EITHER A CLEAR HORIZONTAL DISTANCE OF 12” FROM CABLE AND TELEPHONE CONDUITS OR AN 18” VERTICAL <br />CLEARANCE WHEN SHARING A TRENCH. THE ELECTRIC COMPANY SHALL MAKE THE CONNECTION TO THE ELECTRIC MAIN LINE. THE ELECTRIC COMPANY <br />SHALL PROVIDE THE CT’S AND THE CONTRACTOR SHALL PROVIDE AND INSTALL THE CABINET. THE CONTRACTOR SHALL INSTALL THE CT’S AND GET AN <br />ELECTRICAL INSPECTION APPROVAL FROM THE ELECTRIC COMPANY. THE ELECTRIC COMPANY SHALL PROVIDE AND INSTALL THE ELECTRIC METER AND <br />CANISTER AND MAKE THE CONNECTION AT THE METER. THE CONTRACTOR SHALL COORDINATE THE ELECTRICAL SERVICE INSTALLATION WITH THE <br />ELECTRIC COMPANY. <br />D. TELEPHONE/CABLE SERVICE: <br />THE CONTRACTOR SHALL TRENCH, BACKFILL, PROVIDE AND INSTALL 1-4” SCH 40 PVC CONDUIT WITH LONG SWEEPING BENDS AND PULL WIRE FROM THE <br />UNDERGROUND UTILITY BACK TO THE ELECTRIC/DATA ROOM. THE CONTRACTOR SHALL PROVIDE AND INSTALL A 4’X4’ MOUNTING BOARD WITH A #6 <br />GROUND WIRE. THE CONTRACTOR SHALL PROVIDE AN AC OUTLET FOR FIBER OPTIC SERVICE IF WANTED BY THE MEDEXPRESS CONSTRUCTION <br />REPRESENTATIVE. THE CONTRACTOR SHALL COORDINATE HOOKUPS WITH THE TELEPHONE COMPANY. THE TELEPHONE COMPANY SHALL <br />PROVIDE/INSTALL THE TELEPHONE LINE, INTERFACE BOX AND MAKE THE CONNECTION AT THE UTILITY POLE AND INTERFACE BOX. THE CONTRACTOR <br />SHALL COORDINATE THE TELEPHONE SERVICE WITH THE TELEPHONE COMPANY. <br />E. GAS: <br />THE CONTRACTOR SHALL COORDINATE/INSTALL A NEW GAS SERVICE LINE FROM THE EXISTING 1.25" GAS MAIN, LOCATED SOUTH OF THE PROPOSED <br />DUMPSTER LOCATION, BACK TO THE PROPOSED BUILDING WITH THE GAS COMPANY. CONTRACTOR TO INSTALL THE GAS METER 3' FROM THE THE BACK <br />DOOR. CONTRACTOR TO INSTALL A 2" SCH 40 PVC SLEEVE WITH A SWEEPING 90 AT THE PROPOSED METER LOCATION ON THE BUILDING AND EXTEND THE <br />SLEEVE BACK WEST TO THE EXISTING PROPERTY LINE. THE GAS COMPANY WILL TIE INTO THE SCH 40 SLEEVE AND PERFORM THE NEW TAP INTO THE <br />EXISTING MAIN LINE. <br />UTILITY PLAN GENERAL NOTES: <br />1.GENERAL CONTRACTOR TO VERIFY ALL UTILITY INFORMATION REQUIREMENTS (GAS, ELECTRIC, TELEPHONE, WATER AND SANITARY) WITH EACH <br />UTILITY COMPANY. ALL REQUIREMENTS SHOULD BE INCLUDED IN BASE BID. ANY DISCREPANCIES PLEASE NOTIFY THE ENGINEER PRIOR TO <br />CONSTRUCTION. ALL REQUIREMENTS SHOULD BE INCLUDED IN BASE BID. <br />2.THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ELEVATION AND LOCATION OF ALL UTILITIES BY VARIOUS MEANS PRIOR TO BEGINNING ANY <br />EXCAVATION. TEST PITS SHALL BE DUG AT ALL LOCATIONS WHERE SEWERS CROSS EXISTING UTILITIES, AND THE HORIZONTAL AND VERTICAL <br />LOCATIONS OF THE UTILITIES SHALL BE DETERMINED. THE CONTRACTOR SHALL CONTACT THE OWNER IN THE EVENT OF ANY UNFORESEEN <br />CONFLICTS BETWEEN EXISTING AND PROPOSED UTILITIES SO THAT AN APPROPRIATE MODIFICATION MAY BE MADE. <br />3.THE CONTRACTOR SHALL ARRANGE FOR AND COORDINATE WITH THE RESPECTIVE UTILITY COMPANIES FOR SERVICE INSTALLATIONS AND <br />CONNECTIONS AND MAIN AND SERVICE RELOCATIONS. THE CONTRACTOR SHALL COORDINATE THE WORK TO BE PERFORMED BY THE VARIOUS <br />UTILITY COMPANIES AND SHALL SECURE ALL PERMITS AND PAY ALL FEES FOR CONNECTIONS, DISCONNECTIONS, RELOCATIONS, INSPECTIONS, AND <br />DEMOLITION, AS NECESSARY. <br />4.THE CONTRACTOR SHALL MAINTAIN ALL FLOWS AND UTILITY CONNECTIONS TO EXISTING BUILDINGS, ETC. WITHOUT INTERRUPTION UNLESS/UNTIL <br />AUTHORIZED TO DISCONNECT BY THE OWNER, UTILITY COMPANIES, AND GOVERNING AUTHORITIES. THE CONTRACTOR SHALL INSTALL AS <br />NECESSARY, TEMPORARY SITE LIGHTING, GAS, SANITARY, WATER, STORM, ELECTRIC, TELEPHONE, AND CABLE SERVICES TO SERVICE BUILDING(S) TO <br />REMAIN OPEN. <br />5.RELOCATION OF ANY UTILITY COMPANY FACILITIES TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY COMPANY AND LOCAL <br />MUNICIPALITY. <br />CODED NOTES: <br />1.PROPOSED 6" SANITARY SERVICE LINE PER CITY OF ARDEN HILLS REQUIREMENTS. CONTRACTOR TO INSTALL SERVICE PER CITY REGULATIONS <br />AND SPECIFICATIONS. SEE GENERAL UTILITY NOTE A FOR ADDITIONAL DETAILS. <br />2.PROPOSED COMBINED WATER AND FIRE PROTECTION SERVICE LINE, WITH METER AND BACKFLOW PREVENTER IN BUILDING (REFER TO PLUMBING <br />PLAN). SEE GENERAL UTILITY NOTE B FOR WATER SERVICE DETAILS. <br />3.PROPOSED ELECTRIC SERVICE ROUTE. SEE GENERAL UTILITY NOTE C FOR ELECTRIC SERVICE DETAILS. <br />4.PROPOSED TELEPHONE/CABLE SERVICE ROUTE. SEE GENERAL UTILITY NOTE D FOR ADDITIONAL DETAILS. <br />5.PROPOSED GAS SERVICE AND METER PER LOCAL UTILITY DIRECTION. CONTRACTOR TO VERIFY AND COORDINATE POINT OF CONNECTION WITH <br />XCEL ENERGY FOR PROPOSED SERVICE LOCATION. SEE GENERAL UTILITY NOTE E FOR GAS SERVICE DETAILS. <br />LEGEND <br />C6.0 <br />ZDF <br />CBW <br />CBW <br />752647 <br />9/1/16 <br />CONSTRUCTION DOCS <br />UTILITY PLAN <br />EXISTING <br />REFER TO TITLE SHEET FOR <br />EXISTING LEGEND INFORMATION <br />SHEET NO. <br />JOB NO.: <br />DATE: <br />CHECKED: <br />DRAWN: <br />DESIGN: <br />ISSUE: <br />NO <br />. <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />D <br />E <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />W:\PROJECTS\MEDEXPRESS\752647-01 ARDEN HILLS, MN-GU\03-CIVIL\PLAN\PLAN\CDS\752647_6-UTILITY.DWG - 9/22/2016 2:20 PM <br />CO <br />P <br />Y <br />R <br />I <br />G <br />H <br />T <br />: <br /> <br />T <br />H <br />E <br />S <br />E <br /> <br />D <br />R <br />A <br />W <br />I <br />N <br />G <br />S <br /> <br />A <br />R <br />E <br /> <br />T <br />H <br />E <br /> <br />P <br />R <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />O <br />F <br /> <br />ME <br />D <br />E <br />X <br />P <br />R <br />E <br />S <br />S <br />ME <br />D <br />E <br />X <br />P <br />R <br />E <br />S <br />S <br />AR <br />D <br />E <br />N <br /> <br />H <br />I <br />L <br />L <br />S <br />, <br /> <br />M <br />N <br />CO <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br /> <br />D <br />O <br />C <br />U <br />M <br />E <br />N <br />T <br />S <br />11 <br />5 <br />0 <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br /> <br />R <br />D <br /> <br />E <br />, <br /> <br />A <br />R <br />D <br />E <br />N <br /> <br />H <br />I <br />L <br />L <br />S <br />, <br /> <br />M <br />N <br /> <br /> <br />5 <br />5 <br />1 <br />1 <br />2 <br />1 <br />09 <br />/ <br />2 <br />3 <br />/ <br />2 <br />0 <br />1 <br />6 <br />PL <br />A <br />N <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br />C <br />O <br />M <br />M <br />E <br />N <br />T <br />S <br />Minnesota'sOne Call-Center <br />CALL 811 or (800)252 1166- <br />(651)454 0002- <br />GOPHER STATE O E ANCL L <br />This i ieee ettmmnadvry <br />G!GOPO T TESAHERNEALLC <br />CO <br />OPEN CUT W/ FULL DEPTH <br />PAVEMENT REPLACEMENT <br />REMOVE EXISTING UTILITY(R) <br />1 <br />9.22.16