My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
11-09-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:06:16 AM
Creation date
6/7/2017 10:57:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for November 9, 2016 <br /> <br />Page 3 of 18 <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Planned Unit Development process is a tool that provides additional flexibility for <br />development that an underlying zoning district would not otherwise allow. For example, a PUD <br />may make exceptions to setbacks, lot coverage, parking requirements, signage, building <br />materials, or landscaping requirements. It is intended to overcome the limitations of zoning <br />regulations and improve the overall design of a project. In this case, the PUD will allow the <br />property to retain almost half of the existing trees on the site, as well as allow much of the <br />existing slope of the property to remain. While the PUD process allows the City to negotiate <br />certain aspects of the development, any conditions imposed on the PUD must have a rational <br />basis related to the expected impact of the development. <br /> <br />The first step in the PUD process is the Master PUD, which is a detailed concept plan for the <br />entire development proposal, often outlining individual phases for development over a specified <br />period of time. The second step is the Final PUD for each phase, which is a more detailed <br />review as each development phase moves forward. During the Master PUD stage, the City <br />works with the applicant to set an overall design framework or standard for a proposed <br />development. These standards are then written into a development agreement which generally <br />includes the design standards, a list of conditions, the size of the development, and what, if any, <br />deviations from the underlying zoning district will be permitted. Once the Master PUD is <br />approved, the applicant then creates a development that conforms to the development agreement <br />for each subsequent Final PUD phase. This application is requesting the concurrent approval of <br />a Final PUD for Lot 1 and Lot 3. The level of detail is guided by the type and scale of the <br />development as well as the guidance or flexibility within the Zoning Code. <br /> <br />3. Surrounding Area: <br />Direction Future Land Use Plan Zoning Existing Land Use <br />North Light Industrial and Office I-1 Limited Industrial District Light Industrial/Office <br />South Light Industrial and Office I-1 Limited Industrial District Light Industrial/Office <br />East Business Park (Shoreview) Planned Unit Development Light Industrial/Office <br />West Light Industrial and Office I-1 Limited Industrial District Light Industrial/Office <br />4. Site Data: <br />Future Land Use Plan: Light Industrial and Office <br />Existing Land Use: Light Industrial (office space, manufacturing, and warehousing) <br />Zoning: I-1 Limited Industrial District <br />Lot Size: 4.86 acres <br />Topography: The developed portion of the site contains the current bank building and parking <br />lot. The three undeveloped acres are forested and partially covered by wetlands. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.