ARDEN HILLS PLANNING COMMISSION – October 5, 2016 2 <br /> <br />to be completed in three stages. A total of 97,035 square feet of retail and commercial building <br />space was approved under the original PUD. For each successive phase of the redevelopment, a <br />Final PUD plan is required to be submitted to verify general conformance with the Master PUD <br />and to provide more detailed development plans for the phase to be implemented. <br /> <br />Senior Planner Bachler explained Phase I of the Master PUD was completed in 2012 and <br />included the construction of the Walgreens Pharmacy, modifications to parking and circulation <br />within the retail center, and stormwater management improvements. The Tavern Restaurant on <br />Lexington Avenue, which is currently under construction, is identified as Phase III of the Master <br />PUD. <br /> <br />Senior Planner Bachler reported MedExpress has requested a Final PUD for Phase II of the <br />Arden Plaza Master PUD to develop Lot 2, Arden Plaza for a 4,733 square foot neighborhood <br />medical clinic. The Master PUD Site Plan shows Phase II being developed as a 6,000 square foot <br />commercial building. The proposal by MedExpress would result in an overall lower density of <br />development on the site than what was originally approved for Phase II. The development plans <br />are in substantial conformance with the Master PUD plans. <br /> <br />Senior Planner Bachler indicated MedExpress operates numerous medical centers similar to the <br />one proposed for Arden Plaza across the country, and the company is expanding its operations in <br />Minnesota. Local medical centers have recently opened in the communities of Eden Prairie and <br />Plymouth. MedExpress offers a broad scope of services, including urgent care, employer health <br />services, and basic wellness and prevention services. The Arden Hills center would be open daily <br />from 8:00 a.m. to 8:00 p.m. <br /> <br />Senior Planner Bachler stated the proposed site design orients the clinic towards the other <br />buildings within the Arden Plaza retail center with the main entrance located at the southeast <br />corner of the building. Surface parking with a total of 29 stalls would be located on the south side <br />of the lot and would be mostly screened from County Road E by the building and landscaping <br />improvements. Sidewalks have been provided to create pedestrian connections with the public <br />sidewalk on County Road E and the internal retail center sidewalks. <br /> <br />Senior Planner Bachler commented the Planned Unit Development process is a tool that <br />provides additional flexibility for development that an underlying zoning district would not <br />otherwise allow. For example, a PUD may make exceptions to setbacks, lot coverage, parking <br />requirements, signage, building materials, or landscaping requirements. It is intended to <br />overcome the limitations of zoning regulations and improve the overall design of a project. <br />While the PUD process allows the City to negotiate certain aspects of the development, any <br />conditions imposed on the PUD must have a rational basis related to the expected impact of the <br />development. A PUD cannot be used to permit uses that would not otherwise be permitted in the <br />underlying zoning district. <br /> <br />Senior Planner Bachler stated if a PUD is comprised of multiple lots, it is often treated as one <br />continuous development. The development as a whole would be expected to meet the <br />landscaping, stormwater, and other similar requirements. For example, one property in the PUD <br />may have 60 percent building coverage, but the development as a whole may not exceed 50 <br />percent building coverage to maintain conformance with the underlying zoning district. In order