My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
11-09-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:06:16 AM
Creation date
6/7/2017 10:57:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – October 5, 2016 5 <br /> <br />13. The Developer shall obtain a Right-of-Way Permit from Ramsey County for any <br />construction work required for the development within the County Road E right-of-way. <br />14. The building shall be permitted no more than a total of 150 square feet of wall signage. <br />15. All roof-mounted mechanical equipment shall be screened from ground-level view of <br />public streets. Wood screening shall not be permitted. <br />16. Trash service enclosure shall be fully enclosed and constructed with the same brick fiber <br />cement panel used for the principal structure. <br />17. All spandrel glass used on the building shall be light grey or other color that closely <br />matches the appearance of the transparent glass being used. <br /> <br />Senior Planner Bachler reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Thompson opened the floor to Commissioner comments. <br /> <br />Chair Thompson asked if the City has revisited the traffic flow for this development. <br /> <br />Senior Planner Bachler reviewed the original traffic study completed for the Master PUD <br />application. He reported the City Engineer has reviewed each proposed phase of the Master PUD <br />in order to address the internal flow of traffic. <br /> <br />Commissioner Jones questioned if the applicant was requesting a monument sign. <br /> <br />Senior Planner Bachler stated as part of the Master PUD approval, two monument signs were <br />approved and reviewed the location of these signs. He noted MedExpress would not be allowed <br />to install an additional monument sign. <br /> <br />Ryan Abraham, Project Manager for MedExpress, provided the Commission with pictures of <br />another MedExpress building that was recently constructed, along with a brick sample. He <br />described how the brick panels would be secured to the building. <br /> <br />Commissioner Jones requested further information on the windows. <br /> <br />Mr. Abraham described the windows that would be used on the MedExpress building. <br /> <br />Commissioner Zimmerman questioned how MedExpress would be staffed. <br /> <br />Mr. Abraham reported the site would have two PA’s in the front office with one doctor, one <br />nurse and one x-ray tech on site at all times. He anticipated a nurse practitioner would be <br />brought to the site as well. <br /> <br />Commissioner Zimmerman asked if MedExpress would accept all forms of insurance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.