My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-07-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
12-07-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:13:01 AM
Creation date
6/7/2017 11:04:52 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved July 13, 2015 <br /> <br />Section 6: Building and Site Development Standards TCAAP Redevelopment Code <br />Page | 43 <br /> <br />(h) Measuring Heights: <br />i. Elevator and stair enclosures; public flagpoles and monuments; and chimneys are <br />exempt from the height limit. <br />ii. Spires, belfries, cupolas, and domes of churches shall not exceed a height of 65 feet as <br />measured from the ground level. <br />iii. Vents, tanks, solar energy systems, HVAC equipment, and other mechanical enclosures <br />shall be exempted from the height limits so long as they do not extend more than 1512 <br />feet above the roof upon which they are located. <br />iv. Internal building height shall be measured from finished floor to bottom of the structural <br />members of the ceiling. <br />v. Floor to ceiling heights shall not apply to parking structures or civic buildings. <br />(i) Encroachments: <br />i. Encroachments into the public right-of-way shall not be permitted. <br />ii. Encroachments over Required Setbacks: Canopies, awnings, galleries, and balconies <br />may encroach over any required setback areas per standards established in each <br />zoning district as long as the vertical clearance is a minimum of 10 feet from the <br />finished sidewalk elevation. <br />1. Maximum of 50% of the depth of the sidewalk or 10 feet (whichever is less) <br />(except blade signs which shall encroach no more than 6 feet from the building <br />façade line). <br />2. In no case shall an encroachment be located over an on-street parking or travel <br />lane. <br />3. Additional license agreements are required for all encroachments over public right- <br />of-way. <br />(j) Phased Developments: Due to the long-term development vision within the TRC, certain <br />building form and site development standards may be deferred for phased development <br />projects meeting the following criteria: <br />i. Submission of a site plan that illustrates how development and any related private <br />improvements will be phased over time. Each phase of the site plan shall independently <br />comply with all applicable standards of the TRC unless a Permitted Adjustment is <br />granted. <br />ii. Required private landscaping and open space amenities may also be phased with the <br />building. <br />iii. If a full block is being phased in development, design and development standards may <br />be measured at the full block level in order to accommodate the various phases of the <br />development. <br />(k) Required Public Improvements: All site plans that require public improvements such as <br />sidewalk and streetscape improvements may be deferred through the payment of a <br />proportional fee-in-lieu when the entire length of that block is not within the site plan.
The URL can be used to link to this page
Your browser does not support the video tag.