Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for June 7, 2017 <br />P:\Planning\Planning Cases\2017\PC 17-013 - Boston Scientific - PUD Amendment\Memos_Reports_17-013 <br /> <br />Page 2 of 9 <br />Planning Case Request Comments CC Action <br />15-001 PUD Amendment <br />Update to Campus <br />Master Plan 02/23/15 (Approved) <br />15-017 Site Plan Review <br />Relocation of daycare <br />facility and parking <br />modifications 08/31/15 (Approved) <br />16-004 Site Plan Review <br />Buildings 3 and 10 <br />skyway connection 02/29/16 (Approved) <br />17-002 Site Plan Review <br />Daycare facility parking <br />area modifications 03/13/17 (Approved) <br /> <br />1. Overview of Request <br /> <br />The purpose of the proposed addition is to allow Boston Scientific to construct a new and <br />expanded sterilization facility in Building 9. The company’s existing sterilization facility is <br />located in Building C and its relocation to Building 9 is part of a process that has been underway <br />for the past several years to move operations out of Buildings A, B, and C to allow for their <br />eventual sale. The facility will be used for the sterilization of medical products manufactured by <br />Boston Scientific. <br /> <br />The addition would be located on the northeast corner of Building 9, which is located in the <br />northeast corner of the campus adjacent to Cummings Park Drive and Lexington Avenue North. <br />The sterilization facility would have a footprint of 4,927 square feet measuring approximately 97 <br />feet in length and 46 feet in width. The location of the addition would impact an existing parking <br />area on the north side of Building 9. As a result of the construction, eight parking stalls would be <br />removed. The project would also include 3,400 square feet of interior renovations for the new <br />sterilization facility. <br /> <br />The addition would be approximately 15 feet in height with a mechanical penthouse extending <br />an additional 13.5 feet above the roof deck on a portion of the structure. The addition would be <br />constructed with reinforced masonry material. Exterior finish materials would include <br />translucent fiberglass, synthetic stucco, and metal profile panels. <br /> <br />Operating equipment located on the roof would be screened by an approximately 9-foot metal <br />paneling screen. Additional ground level operating equipment would be contained in an <br />approximately 403 square foot enclosure on the west side of the proposed addition. A complete <br />plan set, including building and grading plans, is provided in Attachment C. <br /> <br /> <br /> <br /> <br />