My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
06-12-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 10:11:29 AM
Creation date
6/9/2017 10:06:58 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br /> CONSENT ITEM – 5H <br /> MEMORANDUM <br /> <br /> <br />DATE: June 12, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/ City Engineer <br /> <br />SUBJECT: Perry Park Playground Concrete Work <br /> <br /> <br /> <br />Requested Action <br /> <br />Authorize the purchase and installation of concrete curb and sidewalk for the Perry Park <br />playground from Norsk Concrete Construction, Inc. in the amount of $15,770.00. <br /> <br />Background <br /> <br />The existing play structure at Perry Park was installed in the summer of 1997. The play structure <br />is a steel structure that is showing signs of wear. The wood surrounding the structure is in poor <br />condition and the steel is rusting. The 2016 Capital Improvement Program (CIP) identified the <br />play structure replacement in 2016. Council approved the purchase and installation of the new <br />play structure at the April 20, 2017 Council meeting. <br /> <br />Public Works staff has removed the old equipment and is grading the site to bring it in <br />compliance with current accessibility standards. Staff has received two quotes to install the <br />ribbon curbing around the play area, install sidewalk along the parking lot to the dog park and <br />install a pedestrian ramp at the parking lot (Attachment A). <br /> <br />Discussion <br /> <br />Quotes were received from Norsk Concrete Construction, Inc. and Midwest Concrete Services, <br />Inc. Norsk submitted the lowest quote at $15,770.00 (Attachment B). Midwest’s quote was <br />$18,000.00 <br /> <br />Attachments <br /> <br />A – Perry Park Playground Area Layout <br />B – Quote from Norsk Concrete Construction, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.