Laserfiche WebLink
Page 3 <br />kimley-horn.com 2550 University Avenue West, Suite 238N, St. Paul, MN 55114 651 645 4197 <br />as possible would be beneficial considering the volume of work that needs to be completed <br />to ready the site for development. <br />The June 2015 Preliminary Design Report and the subsequent design work for Bid <br />Packages #1 and #2 have established a good foundation for the required public <br />infrastructure; however, there is still a lot of work to be done to allow Bid Package #3 to <br />proceed to construction in 2017. I hope that this memo helps provide a good framework for <br />our next steps. Please let me know if you have questions or we can provide additional <br />information. <br />Copy:Heather Worthington / Ramsey County <br />Jill Hutmacher / City of Arden Hills