My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-01-16 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2016
>
08-01-16 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 11:28:43 AM
Creation date
6/12/2017 11:28:19 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br /> <br />Rice Creek has gone through a major transformation over the past several months. Under the <br />direction of the Rice Creek Watershed District, the middle section of Rice Creek was <br />transformed back to its original meandering path and stabilized along its banks with native <br />plants and trees. Approximately 500 new feet of stream were created during the course of the <br />project. <br />Water has begun to flow through the new channel. Construction crews are placing riprap, and <br />staff are monitoring creek flows and growth of new turf to ensure the process does not cause <br />erosion. After the remeander is complete, crews will begin filling the old creek bed and <br />constructing a roundabout intersection at County Road H and I-35W, providing a gateway <br />entrance to Rice Creek Commons. <br />County Road H interchange <br />Reconstruction of County Road H from Old Highway 8 to Rice Creek Commons began in May. <br />This project includes replacing the bridge over I-35W and the intersection with Highway 10. <br />Construction of the new, wider bridge over the interstate is underway. County Road H and the <br />I-35W interchange will be completed by the end of the 2016 construction season. However, <br />some elements of the project will extend into 2017, including construction of a new northbound <br />I-35W off-ramp directly to Rice Creek Commons. <br />Having trouble viewing this email? View it as a Web page. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.