My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-06-15 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2015
>
04-06-15 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 11:58:43 AM
Creation date
6/12/2017 11:55:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TCAAP Energy Integration Resiliency Framework <br />Next Steps and Conclusion <br /> <br /> <br /> 82 <br />6. Next Steps and Conclusion <br />6.1. Next Steps <br />To achieve the TCAAP energy vision and achieve sustainable benefits for the City and the surrounding <br />community, the JDA will need to begin implementation on each of the individual opportunities <br />presented in this Framework. The Project Team recommends the following immediate actions related <br />to each opportunity. <br />6.1.1. Partnerships <br />Continue partnership discussions with the MNARNG, Xcel Energy, the University of Minnesota Center <br />for Sustainable Building Research, and other stakeholders as development of the site and the various <br />energy opportunities progress. <br />6.1.2. Solar PV <br />Develop an RFP for the development of a solar array on the Primer Tracer site. The RFPs could be sent <br />to Xcel Energy and local community solar developers. In parallel to the site development RFP process, <br />the County and the MNARNG should begin the process needed to secure the Primer Tracer land for a <br />solar development. <br />6.1.3. Combined Heat and Power <br />As part of the developer selection process, the JDA should work with prospective developers to identify <br />opportunities for serving those buildings’ electric and thermal energy needs with a CHP facility. The <br />JDA and County should also coordinate with the MNARNG and Xcel Energy to define an initial CHP <br />facility that can serve the current loads in the area, align with the energy goals of the MNARNG, and be <br />expanded in the future to meet the emerging TCAAP energy loads as they occur. <br />6.1.4. Low-Temperature District Energy System <br />The JDA should develop the business plan for the proposed low-temperature district energy system <br />and form the operational organization in preparation for the site development request for proposals. <br />In addition, the County should work with the Army and the appropriate regulatory authorities to obtain <br />approval to extract energy from the treated ground water, and utilize the existing pump house for the <br />low-temperature district energy distribution loop. Lastly, the JDA should continue collaboration with <br />Xcel Energy to explore a neighborhood that is independent of the natural gas system, through district <br />energy and electric grid services.
The URL can be used to link to this page
Your browser does not support the video tag.