My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-06-15 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2015
>
04-06-15 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 11:58:43 AM
Creation date
6/12/2017 11:55:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TCAAP Energy Integration Resiliency Framework <br />Energy Source Implementation <br /> <br /> <br /> 42 <br /> <br />CHP Economic Assumptions <br /> Traditional Scenario CHP Scenario <br />Description Purchased Grid Power with Gas Boilers Gas Engine CHP with District Energy <br />Site Thumb & Town Thumb & Town <br />Analysis Term 25 years 25 years <br />Gas Price $7.00/MMBtu1 $5.50/MMBtu2 <br />Electric Price $0.10/kWh $0.10/kWh <br />Escalation 3% 3% <br />Project Cost $800,000 $4,600,000 <br />O and M Cost3 $0/yr $56,000/yr <br />Notes: <br />1. Firm commercial gas rate <br />2. Interruptible gas rate <br />3. Incremental cost difference <br />Table 12: CHP project economic assumptions <br />The economic assumptions provided above were coupled with the CHP energy production numbers <br />developed to estimate the annual savings generated by the CHP project. The annual energy usage, <br />annual utility costs, and economic performance of the project are provided in Table 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.