Laserfiche WebLink
TCAAP Energy Integration Resiliency Framework <br />Policy White Paper – Expected TCAAP Development <br /> <br /> 18 <br />4. Expected TCAAP Development <br />The City, the County, and the JDA have been working to develop the master plan for development of <br />the TCAAP site. During the master planning process, they have identified five major areas of <br />development for the site. These areas of the development are the Thumb, Town, Hill, Creek, and Flex. <br />These areas are classified in the table below based on the current status of the master planning <br />process. <br />Development <br />Area <br />Zoning <br />Classification <br />Estimated Unit <br />Density <br />Number of Acres Maximum <br />Building <br />Height <br />Thumb Campus Commercial 1 Story Bldg/4 Acres 46 Ac 45’ <br />Town <br />Office Mixed Use 20-40 Units/Acre 25 Ac 65’ <br />Retail Mixed Use 20-40 Units/Acre 16 Ac 65’ <br />Mixed Use 8-10 Units/Acre 11 Ac 55’ <br />Neighborhood 3-4 Units/Acre 48 Ac 40’ <br />Hill Neighborhood 3-4 Units/Acre 62 Ac 40’ <br />Creek Neighborhood 3-4 Units/Acre 42 Ac 40’ <br />Flex Flex Office 2 Story Bldg/4 Acres 75 Ac 45’ <br />Using the property density and proposed usage, the Project Team developed an estimate of the energy <br />usage for each area of the development. <br />Total Project Energy Consumption by Area <br />Area Load (Kbtu) Square Feet % of Load <br />Thumb 264,065,599 3,402,907 26% <br />Office 188,467,390 2,428,703 18% <br />Retail 63,852,464 682,184 6% <br />Mixed Use 32,790,602 350,327 3% <br />Multi-Family 34,990,409 1,599,240 3% <br />Town (low-density) 46,614,676 1,178,944 5% <br />Hill 13,775,509 348,400 1% <br />Creek 9,252,207 234,000 1% <br />Flex 366,704,807 3,917,786 36% <br />TOTAL 1,020,513,663 14,142,492 100% <br />