My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-7-2013 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2013
>
10-7-2013 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 4:37:26 PM
Creation date
6/12/2017 4:36:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
east split west central <br />23.5%41.1%35.3%0% <br />Major Themes <br />TCAAP Open House #1—September 17, 2013 <br />Land Use Planning Exercise Responses <br />Road Alignment Options <br />• Too much office <br />• Is industrial a possibility here? <br />• Mixed use buildings, housing over shops <br />• Look at existing rail corridors! Could it be a LRT? <br />Could it be a trail? <br />• Many participants desired trails throughout the site <br />connecting the central park and the wildlife corridor <br />• Must consider the surrounding areas too — <br />interconnected neighborhoods <br />Key Comments <br />Most thought this <br />should be almost <br />entirely office or open <br />space <br />Most wanted <br />commercial <br />along this entry <br />bridge <br />Many lined the western <br />edge with office and/or <br />retail <br />A third of exercises <br />filled the southern <br />section with <br />commercial use <br />Participants often <br />envisioned residential <br />use on the eastern edge <br />Almost all kept the open space <br />in a few big chunks, primarily in <br />the center
The URL can be used to link to this page
Your browser does not support the video tag.