My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-02-13 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2013
>
12-02-13 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 4:37:50 PM
Creation date
6/12/2017 4:37:39 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joint Development Authority <br /> TCAAP Redevelopment Project <br />• Participants wanted to minimize their time spent on household chores and maintenance – most <br />preferred a home no larger than necessary and a homeowner’s association to take care of <br />mowing and shoveling. <br /> <br />When asked how to reach a younger demographic, attendees responded that events such as the one at <br />Land O’Lakes are an innovative and effective way to reach their age group. Participation makes them <br />want to seek additional opportunities to be involved. Attendees also suggested using social media tools <br />such as Facebook, Instagram, and Linked-In. <br /> <br />Based on the success of the workshop and the positive feedback received, the City will work with SPACC <br />to schedule additional on-site workshops at major employers in January and February. <br /> <br />Transportation <br /> <br />The Metropolitan Council has announced that it will evaluate a future extension of the Snelling Avenue <br />Bus Rapid Transit (BRT) line from Rosedale Mall to TCAAP via Snelling and Hamline Avenues <br />(announcement attached). The extension would run north on Snelling and Hamline Avenues and could <br />serve University of Northwestern, Bethel University, the County Road E business district, Land O’Lakes <br />and Boston Scientific. Metro Transit will conduct a study to determine the feasibility of BRT extension to <br />TCAAP. <br /> <br />An open house to gather public feedback on the design options for the Highway 96 and County Road H <br />intersections with I-35W was held at the Ramsey County Public Works facility in Arden Hills on <br />November 19, 2013. Attendees were encouraged to view the concepts for both interchanges and ask <br />questions of the staff present. The event was well attended with 66 members of the general public <br />signing-in at the welcome table and more who declined to sign-in. Staff were present from Arden Hills, <br />Ramsey County, MnDOT, and Kimley-Horn and Associates. <br /> <br />A handout was given to attendees that included a general project summary and project timeline. 16 <br />boards were displayed showing area constraints, concepts for both interchanges, and a basic overview <br />of TCAAP. <br /> <br />11 comments were submitted in writing at the open house. The nature of the comments consisted <br />mostly of concerns with bicycle and pedestrian access, access to TCAAP, pros and cons of roundabouts <br />in general, and the construction impacts of the interchanges. Verbal feedback was generally positive <br />about the momentum to improve the interchanges and raised concerns similar to those submitted in <br />writing. <br /> <br />The concept designs are posted on the TCAAP Master Plan page of the City’s website. <br /> <br />Next Steps <br /> <br />City Council review of the first Master Plan draft is scheduled for December 16, 2013. The next TCAAP <br />open house is tentatively scheduled for Wednesday, January 22, 2014. Master Plan consultants will also
The URL can be used to link to this page
Your browser does not support the video tag.